Completed Projects - 2002

Last updated: December 30, 2002

• Additional source: 2002 Capital Improvements Report

 Fairfield Twp  Milford Twp  St. Clair Twp
 Hanover Twp  Morgan Twp  Wayne Twp
 Lemon Twp  Oxford Twp  West Chester Twp
 Liberty Twp  Reily Twp  
 Madison Twp  Ross Twp  

Fairfield Township

  • Betsy Ross Court from Betsy Ross Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $4,893. Funding: Fairfield Twp.
  • Betsy Ross Drive from Red Coat Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $11,254. Funding: Fairfield Twp.
  • Canal Road between Allison Avenue and Headgates Road
    Significant roadway washouts and emergency repairs from July 2001 flash flooding.
    Complete. Cost: $250,000. Funding: FEMA.
    News release: Repairs begin.
    Photo 1: Storm damage (Jul 01).
    Photo 2: Storm damage (Nov 01).
    Photo 3: Completed repairs (Sep 02).
    Photo 4: Completed repairs (Sep 02).
  • Clarion Court from cul-de-sac to cul-de-sac
    Resurfacing.
    Complete. Cost: $13,863. Funding: Fairfield Twp.
  • East Ridge Drive from Headgates Road to cul-de-sac
    Resurfacing.
    Complete. Cost: $18,104. Funding: Fairfield Twp.
  • Fernway Drive from Hamilton corp. to dead end
    Resurfacing.
    Complete. Cost: $22,276. Funding: Fairfield Twp.
  • Greenlawn Road from Millikin Road to Ohio 4
    Resurfacing.
    Complete. Cost: $43,287. Funding: Fairfield Twp.
  • Hollytree Court from East Ridge Drive to dead end
    Resurfacing.
    Complete. Cost: $8,022. Funding: Fairfield Twp.
  • Kelso Court from Red Coat Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $5,872. Funding: Fairfield Twp.
  • Liberty Bell Court from Red Coat Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $8,807. Funding: Fairfield Twp.
  • Liberty Fairfield Road at Princeton Road
    Intersection improvement - Add turn left lanes and signals, improve sight distance, cut down hill and replace bridge west of intersection, raise profile slightly on east side of intersection.
    Project mostly complete. Final paving and signalization to be completed in spring 2003. ODOT managing construction phase. Cost: $883,411. Funding: Federal, BCEO.
    Photo 1: Intersection before construction. View west.
    Photo 2: Utility relocations. View south (Jun 02).
    Photo 3: Utility relocations. View south (Jun 02).
    Photo 4: Construction. View east. (Nov 02).
  • Princeton Road east side of Bypass 4 intersection
    Add turn lane, raise vertical alignment and improve sight distance on Princeton, northbound lane addition to Bypass 4 on north and south sides of intersection.
    Complete. Project is phase 2 of improvements begun in 2001. BCTID administers contract. BCEO manages construction. Cost: $1.8 million. Funding: TIF thru Fairfield Twp.
    Why the road will be closed for 14 weeks.
    Photo 1: Phase 1 nearly complete, looking east on Princeton Road toward intersection (2001).
    Photo 2: View west on Princeton Road toward intersection. Phase 2 section (Jun 02).
    Photo 3: Completed project. View west on Princeton Road toward intersection. (Oct 02).
  • Red Coat Drive from Saratoga to #7492
    Resurfacing.
    Complete. Cost: $19,327. Funding: Fairfield Twp.
  • Reigart Road from new pavement to MetroPark entrance
    Resurfacing.
    Complete. Cost: $79,132. Funding: Fairfield Twp.
  • Saratoga Court from Saratoga Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $6,932. Funding: Fairfield Twp.
  • Saratoga Drive from Clarion Court to Morris Road
    Resurfacing.
    Complete. Cost: $25,857. Funding: Fairfield Twp.
  • Theodore Drive from Ohio 4 to Fernway Drive
    Resurfacing.
    Complete. Cost: $24,413. Funding: Fairfield Twp.
  • Tylersville Road east of Five Points intersection
    Storm sewer installations.
    Complete. Cost: $101,000. Funding: State CDBG.

Hanover Township

  • Four Mile Creek Road Bridge #01.876
    Bridge repairs and stream bank rebuilt.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo: Top view before repairs.
    Photo: Side view before repairs.
    Photo: Side view after repairs. Bank rebuilt to prevent erosion.
  • Isabella Lane from Regina Place to Columbus Drive South
    Resurfacing.
    Complete. Cost: $13,570. Funding: Hanover Twp.
  • Millville Cemetery - various locations
    Resurfacing.
    Complete. Cost: $16,498. Funding: Hanover Twp.
  • Nichols Road Bridge #01.30
    Deck replacement.
    Complete. Cost: $40,000. Funding: BCEO.
    Photo: Top view (Jun 02).
    Photo: Side view (Jun 02).
  • Salvatore Place from Regina Place to dead end
    Resurfacing.
    Complete. Cost: $23,250. Funding: Hanover Twp.
  • Stahlheber Road from Reily Twp line to U.S. 27
    Resurfacing.
    Complete. Cost: $87,981. Funding: Hanover Twp.

Lemon Township

  •  

Liberty Township

  • Angie Drive from Liberty Fairfield Road to cul-de-sac
    Resurfacing.
    Complete. Cost: $9,243. Funding: Liberty Twp.
  • Belvoir Circle from cul-de-sac to cul-de-sac
    Resurfacing.
    Complete. Cost: $6,437. Funding: Liberty Twp.
  • Bethany Road from Cincinnati Dayton Road to Butler Warren Road
    Resurfacing.
    Complete. Cost: $121,902. Funding: Liberty Twp.
  • Butler Warren Road at Bethany Road
    Intersection improvement including left turn lane additions, and roadway and bridge improvements to Butler Warren.
    Complete. Joint project design by BCEO and Warren County Engineer's Office. Cost: $492,956. Construction cost shared by BCEO, Warren County Engineer's Office, and City of Mason: Butler County share $227,136, Warren County share $241,821, City of Mason share $23,999.
    Photo: Completed.
  • Dartford Way from Deer Run to Millikin Road
    Resurfacing.
    Complete. Cost: $10,144. Funding: Liberty Twp.
  • Deer Run from Dartford Way to cul-de-sac
    Resurfacing.
    Complete. Cost: $18,001. Funding: Liberty Twp.
  • Eddington Drive from Devon Drive to Dartford Way
    Resurfacing.
    Complete. Cost: $21,714. Funding: Liberty Twp.
  • Hamilton Mason Road at Norfolk & Southern Railroad
    Overpass repairs.
    Complete. Funding: N&S
  • Liberty Fairfield Road at Princeton Road
    Intersection improvement - Add turn left lanes and signals, improve sight distance, cut down hill and replace bridge west of intersection, raise profile slightly on east side of intersection.
    Project mostly complete. Final paving and signalization to be completed in spring 2003. ODOT managing construction phase. Cost: $883,411. Funding: Federal, BCEO.
    Photo 1: Intersection before construction. View west.
    Photo 2: Utility relocations. View south (Jun 02).
    Photo 3: Utility relocations. View south (Jun 02).
    Photo 4: Construction. View east. (Nov 02).
  • Liberty Township Bikeway
    Phase 4 construction.
    Completion: spring 2003. BCEO administering design and contruction. Construction: October 21, 2002. Cost: $296,000. Funding: Federal, Liberty Twp.
  • Liberty Township Fire Station #2 and maintenance lot
    Resurfacing.
    Complete. Cost: $12,426. Funding: Liberty Twp.
  • Millikin Road from Mauds Hughes Road to Cincinnati Dayton Road
    Resurfacing.
    Complete. Cost: $377,173. Funding: BCEO.
  • Newgate Place from Eddington Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $6,180. Funding: Liberty Twp.
  • Princeton Road Culvert #00.809
    Culvert replacement.
    Complete. Funding: BCEO Force Account.
  • Severn Place from cul-de-sac to cul-de-sac
    Resurfacing.
    Complete. Cost: $6,463. Funding: Liberty Twp.
  • Van Gordon Road from Hamilton Mason Road to Princeton Road
    Resurfacing.
    Complete. Cost: $111,094. Funding: Liberty Twp.
  • Warrington Court from Eddington Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $3,005. Funding: Liberty Twp.
  • Yankee Road from Dutchland Boulevard to Princeton Road
    Resurfacing.
    Complete. Cost: $97,567. Funding: BCEO.

Madison Township

  • Ada Drive from cul-de-sac to cul-de-sac
    Resurfacing.
    Complete. Cost: $6,733. Funding: Madison Twp.
  • Elk Creek Road Culvert #06.914
    Culvert replacement.
    Complete. Funding: BCEO Force Account.
  • Elk Creek Road Culvert #07.244
    Culvert replacement.
    Complete. Funding: BCEO Force Account.
    Photo: Completed.
  • Ernestine Drive from Jo Anne Lane to dead end
    Resurfacing.
    Complete. Cost: $2,865. Funding: Madison Twp.
  • Eunice Drive from Jo Anne Lane to Elk Creek Road
    Resurfacing.
    Complete. Cost: $2,640. Funding: Madison Twp.
  • Howe Road from Wayne Madison Road to Elk Creek Road
    Resurfacing.
    Complete. Cost: $32,806. Funding: Madison Twp.
  • Kiester Road from Hetzler Road to Beck Road
    Resurfacing.
    Complete. Cost: $33,086. Funding: Madison Twp.
  • Madison Township administration building driveway
    Resurfacing.
    Complete. Cost: $1,874. Funding: Madison Twp.
  • Marts Drive from Circle Parkway to Mosiman Road
    Resurfacing.
    Complete. Cost: $13,311. Funding: Madison Twp.
  • No Mans Road from Elk Creek Road to Dickey Road
    Resurfacing.
    Complete. Cost: $8,231. Funding: Madison Twp.
  • Norma Drive from Ohio 122 to Ada Drive
    Resurfacing.
    Complete. Cost: $2,622. Funding: Madison Twp.
  • Prichard Road from dead end to Montgomery County line
    Resurfacing.
    Complete. Cost: $6,758. Funding: Madison Twp.
  • Radabaugh Road from Sycamore to Ohio 73
    Resurfacing.
    Complete. Cost: $22,795. Funding: Madison Twp.
  • Renee Drive from Ohio 122 to Elk Creek Road
    Resurfacing.
    Complete. Cost: $13,235. Funding: Madison Twp.
  • Sloebig Road Bridge #00.019
    Emergency deck repairs.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo: View from Browns Run Road.
    Photo: Side view.
  • Thomas Road from Sloebig Road to Middletown Germantown Road
    Resurfacing.
    Complete. Cost: $23,454. Funding: Madison Twp.
  • Trenton Franklin Road at Ohio 122
    Piping and drainage improvements.
    Complete. Funding: BCEO.
  • Trenton Franklin Road at CSX Railroad
    Crossing repairs.
    Complete. Funding: CSX
  • Wayne Madison Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
    Photo: Completed.
  • West Alexandria Road at Elk Creek Road
    Intersection improvement.
    Complete. Cost: $175,000. Funding: State CDBG, CIP.
    Photo 1: View of intersection from West Alexandria Road - before construction.
    Photo 2: View of intersection from West Alexandria Road - during construction.
    Photo 3: Complete. View northwest.
  • West Alexandria Road Culvert #00.361
    Culvert replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo: Existing culvert (Jun 02).
  • West Alexandria Road Culvert #01.630
    Culvert replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
  • West Alexandria Road Culvert #01.698
    Culvert repairs - Cut headwalls and replace guardrail.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
  • West Alexandria Road from Strebee Road to Montgomery County line
    Resurfacing.
    Complete. Cost: $37,829. Funding: Madison Twp.

Milford Township

  • Baker Road Bridge #00.135
    Deck replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo.
  • Bauer Road Bridge #00.807
    Deck repairs and guardrail replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo: Top view (Jun 02).
    Photo: Side view (Jun 02).
  • Oxford Middletown Road from U.S. 127 to Hamilton Eaton Road
    Resurfacing.
    Complete. Cost: $17,866. Funding: Milford Twp.
  • State Road from Ohio 744 to dead end
    Resurfacing.
    Complete. Cost: $39,574. Funding: Milford Twp.

Morgan Township

  • California Road Bridge #04.312 (over Dry Fork Creek)
    Bridge replacement.
    Complete. Contract amount: $1,947,075. Funding: Federal LPA, BCEO.
    News release: New California Road Bridge Opens - Bridge Dedicated to All U.S. Veterans and POWs (Jul 18, 02).
    News release: Old bridge closing. New bridge construction begins (Jan 2, 02).
    Photo 1: Old bridge (1999).
    Photo 2: New bridge construction. View south across Dry Fork Creek ravine (Mar 02).
    Photo 3: View north. New road alignment to right approaching bridge from south (Mar 02).
    Photo 4: New bridge construction. View east from bottom of ravine (Mar 02).
    Photo 5: New bridge construction (Mar 02).
    Photo 6: New bridge construction (Mar 02). Road to old bridge can be seen along hillside. Since new bridge will be on straighter alignment, the dangerous S-curves approaching old bridge will be eliminated.
    Photo 7: Setting new bridge beams (Mar 02).
    Photo 8: New bridge beams - side angle (Mar 02).
    Photo 9: Setting new beams. View north (Mar 02).
    Photo 10: Newly placed beams. View north - closeup (Mar 02).
    Photo 11: Newly placed beams. View south (Mar 02).
    Photo 12: View north. Newly realigned road approaching bridge from south (Jun 02).
    Photo 13: New bridge construction - west side angle (Jun 02).
    Photo 14: New bridge construction - east side angle (Jun 02).
    Photo 15: New bridge construction - crane shot (Jun 02).
    Photo 16: New bridge construction - side angle (Jul 02).
    Photo 17: New bridge construction - beam closeup, side angle (Jul 02).
    Photo 18: New bridge construction - side angle. View north (Jul 02).
    Photo 19: New bridge (Jul 02).
    Photo 20: New bridge - underside view (Jul 02).
    Photo 21: New approach to bridge. View north (Jul 02).
    Photo 22: New bridge dedication / ceremonial ribbon cutting. Left to right - State Rep. Shawn Webster, Butler County Commissioner Courtney Combs, WWII Veteran/POW & BCEO Federal Aid Consultant Bob Petrocy, Butler County Engineer Greg Wilkens, Morgan Twp Trustee Nancy Poe with husband (Jul 18, 02).
    Photo 23: New bridge dedication / ceremonial ribbon cutting. Several veterans and public officials line up behind the ribbon. (Jul 18, 02).
    Photo 24: New bridge dedication / ceremonial ribbon cutting. WWII Veteran/POW & BCEO Federal Aid Consultant Bob Petrocy snips the ribbon with the ceremonial scissors while Butler County Commissioner Courtney Combs holds the ribbon. (Jul 18, 02).
    Photo: 25: New bridge dedication / ceremonial ribbon cutting. Butler County Engineer and WWII Veteran/POW & BCEO Federal Aid Consultant Bob Petrocy next to red, white, and blue sign. (Jul 18, 02).
    Photo 26: New bridge. High view north. (Oct 02).
    Photo 27: New bridge. Side view north. (Oct 02).
    Photo 28: New bridge. High view south. (Oct 02).
    Photo 29: New bridge. View north. (Oct 02).
    Photo 30: New bridge. High view north. (Oct 02).
    Photo 31: New bridge. High view north. (Oct 02).
    Photo 32: New bridge. Side view from below. (Oct 02).
  • California Road Bridge #05.789
    Bridge replacement.
    Complete. Cost: $82,500. Funding: State Issue 2, BCEO.
    News Release.
    Photo: Top view, old bridge (Jun 02).
    Photo: Side view, old bridge (Jun 02).
  • Morgan Ross Road from Layhigh Road to maintenance line
    Resurfacing.
    Complete. Cost: $43,350. Funding: Morgan Twp.
  • Race Lane Road Bridge #02.415
    Partial deck and beam replacements.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo 1: Top view of bridge (Jan 02).
    Photo 2: Plate covering pavement and expansion joint deterioration (Jan 02).
    Photo 3: Side view of expansion joint deterioration (Jan 02).
    Photo 4: Removing portion of deck (Apr 02).
    Photo 5: Deteriorated bridge beams (Apr 02).
    Photo 6: Top view of deteriorated beam (Apr 02).

Oxford Township

  • Pamajera Drive from Stillwell Beckett Road to cul-de-sac
    Resurfacing.
    Complete. Cost: $15,658. Funding: Oxford Twp.
  • Stout Road Culvert #00.900
    Culvert replacement and some improvements to intersection at Hayworth Road.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
  • Tamara Court from Pamajera Drive to cul-de-sac
    Resurfacing.
    Complete. Cost: $2,022. Funding: Oxford Twp.
  • Taylor Road Culvert #00.003
    Culvert replacement and some improvements to intersection at Contreras Road.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
    Photo: Old culvert (Jun 02).
  • Taylor Road from Ringwood Road to U.S. 27
    Resurfacing.
    Complete. Cost: $51,269. Funding: Oxford Twp.

Reily Township

  • Garver Elliot Road from Stephenson Road to Bunker Hill Woods Road
    Resurfacing.
    Complete. Cost: $90,000. Funding: Reily Twp.
  • Garner Road Bridge #02.223
    Emergency repairs.
    Complete. Bridge damaged after being struck by vehicle.
    Photo 1: Top view of damaged bridge.
    Photo 2: Side view. Spacer blocks, guardposts, rail damaged. No damage to beams underneath.
  • Hart Road from Ohio 129 to Dunwoody Road
    Resurfacing.
    Complete. Cost: $56,625. Funding: Reily Twp.
  • Indian Creek Road Bridge #01.360
    Deck repairs.
    Complete. Funding: BCEO Force Account.
    Photo 1: Top and side view of bridge.
    Photo 2: Top view.
    Photo 3: Plates covering pavement and expansion joint deterioration.
    Photo 4: Deck repairs begin. Portion of deck removed exposing deteriorated beams.
  • Stillwell Beckett Road Culvert #03.770
    Culvert replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
  • Stillwell Beckett Road at CSX Railroad
    Emergency crossing replacement.
    Complete. Funding: CSX

Ross Township

  • Herman Road from Hamilton New London Road to Ohio 128
    Resurfacing.
    Complete. Cost: $149,725. Funding: Ross Twp.
  • Ohio 128 at Krause Lane / Rossgate Drive
    Intersection improvement.
    Complete. Cost: $128,000. Funding: private.
             News release: Project begins.

St. Clair Township

  • Augspurger Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
  • Eaton Road at Taylor School Road
    Intersection improvement.
    Complete. Cost: $95,428. Funding: BCEO.
    News release.
    Photo: Construction. View north. (Jun 02).
    Photo: Completed. View north. (Aug 02).
  • Hamilton Eaton Road from New Miami corp. to U.S. 127
    Resurfacing.
    Complete. Cost: $32,305. Funding: BCEO.
  • Jackson Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
  • Morganthaler Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
  • Trenton Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
    Photo: Completed.
  • Wayne Madison Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX
    Photo: Completed.
  • Wehr Road at CSX Railroad
    Crossing replacement.
    Complete. Funding: CSX

Wayne Township

  • Eaton Road at Taylor School Road
    Intersection improvement.
    Complete. Cost: $95,428. Funding: BCEO.
    News release.
    Photo: Construction. View north. (Jun 02).
    Photo: Completed. View north. (Aug 02).
  • Oxford Middletown Road Culvert #07.048
    Culvert replacement.
    Complete. Cost: $40,000. Funding: BCEO Force Account.
  • Oxford Middletown Road from Ohio 503 to Ohio 744
    Resurfacing.
    Complete. Cost: $90,955. Funding: Wayne Twp.
  • Oxford Middletown Road Bridge #06.910
    Bridge replacement.
    Complete. Cost: $80,000. Funding: State Issue 2, BCEO.
    News Release.
    Photo: Old bridge.
    Photo: New bridge - Top view (Nov 02).
    Photo: New bridge - Side view (Nov 02).
  • Shurz Road from Stubbs Road to Preble County line
    Resurfacing.
    Complete. Cost: $50,936. Funding: Wayne Twp.
  • Stubbs Road from Jacksonburg Road to Shurz Road
    Resurfacing.
    Complete. Cost: $39,940. Funding: Wayne Twp.

West Chester Township

  • Centre Pointe Drive
    New road extension from Muhlhauser Road to Union Center Boulevard
    Complete. Funding: West Chester Twp TIF.
  • Cincinnati Dayton Road from I-75 to Mauds Hughes Road
    Roadway improvement -- Widen to 5 lanes; I-75 overpass and ramp reconstruction.
    Complete. Contract awarded by ODOT to C.J. Mahan Construction Co. for $11,946,378.39. Funding: Federal, State Issue 2, BCEO.
    News Release (Project completion.)
    Photo 1: Cincinnati Dayton Road construction looking north from Fountains Boulevard (Jan 02).
    Photo 2: Cincinnati Dayton Road bridge over I-75 (Feb 02). New half now open to traffic. Old bridge to be removed so that second half of new bridge can be built.
    Photo 3: Ready to pave new lanes along east side of widened roadway. View north (Jun 02).
    Photo 4: Paving new lanes along east side of widened roadway. West lanes remain open to northbound and southbound traffic. View south (Jun 02).
    Photo 5: Construction at I-75 overpass. Traffic rerouted onto new section of bridge. View south (Jun 02).
    Photo: Completed project.
  • Cincinnati Dayton Road from Gano Road (west section) to Union Centre Boulevard
    Resurfacing.
    Complete. One inch overlay only. Cost: $87,022. Funding: BCEO.
  • Cox Road from Tylersville Road to Hamilton Mason Road
    Roadway improvement -- Widen to five lanes; addition of multiple turn lanes.
    Complete: spring 2003. Final paving, striping, and application of raised pavement markers to be completed in spring 2003. Intersection at Cox and Tylersville to be re-configured with new signals in spring 2003. Project cost: $5.5 million. Funding: Butler County TIF.
    News Release.
    Photo: Construction. View south. Heavy rains create poor working conditions (Jun 02).
  • Crescentville Road at N&S Railroad west of Windisch Road
    Railroad crossing upgrade and turn lane addition.
    Complete. Funding: Norfolk & Southern Railroad.
  • Hadley Drive
    Storm sewer and storm damage repair.
    Complete. Cost: $108,479. Funding: West Chester Twp. BCEO managed construction for West Chester Twp.
    Photo: Construction wraps up.
  • Hamilton Mason Road at Norfolk & Southern Railroad
    Overpass repairs.
    Complete. Funding: CSX
  • Port Union Road from Fairfield corp. to Ohio 747
    Roadway improvement -- Widen to three lanes; cut down hill and improve alignment; replace bridge.
    Completion: spring 2003. Road now open to thru traffic; however, work on the project will continue through the winter. During this final construction phase, the road will remain open with two lanes and temporary striping until the project is completed next spring.
    Contractor: Don S. Cisle Contractor, Inc. Cost: $1.7 million. Funding: State Issue 2, BCEO, West Chester Twp.
    News Release.
    Photo 1: View east from near LeSaint Drive (Feb 02).
    Photo 2: Approaching west end of project traveling east (Feb 02). New road will look like this portion in Fairfield. Hill in distance to left of picture will be cut down.
    Photo 3: Utility relocations near Gold Park Drive and Ohio 747 (Feb 02).
    Photo 4: Cutting down the hill, western end of project. View east. (Jun 02).
  • University Point project
    Construction of new streets in University of Cincinnati Physicians Medical Center Complex: Cox Lane, University Court, University Drive.
    Complete. Project in conjunction with Cox Road improvements, but let as separate contract. Cost: $1,534,458. Funding: Butler County TIF.
    News Release.
  • West Chester Road from Barret Road to U.S. 42
    Resurfacing.
    Complete. Cost: $131,438. Funding: BCEO.
    Photo: Completed.
  • Plus, resurfacing of various township roads
    Complete. Funding: West Chester Twp.

All Townships

  • Various township culvert replacements - Most listed above.
    Complete.
  • Resurfacing of various township roads - Most listed above.
    Complete.
  • County and township centerline and edgeline striping
    Complete. Cost: $100,000. Funding: BCEO.
  • Mowing and weed spray program
    Seasonal / ongoing. No road closures. Funding: BCEO FA.
  • Ditching
    Seasonal / ongoing. No road closures. Funding: BCEO FA.

Project questions? Email us. We'll send you a prompt reply.


Questions or comments about this web site? Email to BCEO Webmaster.

Home | Projects | Road Reports | Permits/Records | What's New | About Us | Butler County | Links | Site Contents 

www.bceo.org