- Completed
Projects - 2003
|
Last
updated: December 22, 2003
Additional
sources: 2003
Capital Improvements Report Flash
flood damage images - June 15, 2003
Fairfield
Township
- Canal Road Bridge
#00.136
- Bridge replacement.
- Complete. Cost: $269,000.
Funding: 50% State Issue 2, 50% BCEO.
- News
release.
- Photo 1: Old bridge - side view (Jan 03).
- Photo 2: Old bridge - side view closeup (Jan
03).
- Photo 3: Construction - placement of conspan
section in stream channel (May 03).
- Photo 4: Construction - headwall placement (May
03).
- Photo 5: Construction - conspan in place (May
03).
- Photo 6: Construction - conspan - side view (May
03).
- Photo 7: Complete (Jul 03).
- Canal Road between
Allison Avenue and Headgates Road
- Emergency pavement
repairs.
- Complete.
- Dan Patch Court from
Morris Road to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Eastridge Drive from
Allison Avenue to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Hagen Court from Niemoeller
Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Ivywood Court from
Ivywood Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Ivywood Drive from
Bayberry Drive to Brofield Drive
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Liberty Fairfield
Road at Millikin Road
- Intersection improvement:
add turn lanes and traffic signal.
- Complete. Cost: $459,760.13.
Funding: State Issue 2, BCEO, Liberty Twp, Fairfield Twp.
- Construction notification to
local residents and businesses.
- Photo 1:
Before construction. View west.
- Photo 2: Construction. View east. (Nov 03).
- Liberty Fairfield
Road at Princeton Road
- Intersection improvement
- Add turn left lanes and signals, improve sight distance, cut
down hill and replace bridge west of intersection, raise profile
slightly on east side of intersection.
- Complete.
ODOT
managed construction phase. Cost: $883,411. Funding: Federal,
BCEO.
- Photo 1:
Intersection before construction. View west.
- Photo 2: Utility relocations. View south (Jun
02).
- Photo 3: Utility relocations. View south (Jun
02).
- Photo 4: Construction. View east. (Nov 02).
- Photo 5: Complete. View north. (2003).
- Photo 6: Complete. View east. (2003).
- Millikin Road at Morris
Road
- Intersection improvement:
turning radii widened and culvert replacement.
- Complete. Project in
conjunction with Fairfield Twp. Cost: $230,966.15. Funding: State
Issue 2, Fairfield Twp, BCEO.
- Construction notification to
local residents and businesses.
- Photo 1: Intersection before construction. View
west (Apr 03).
- Photo 2: Intersection before construction. View
north (Apr 03).
- Photo 3: Complete. View east. (Nov 03).
- Niemoeller Drive from
Schroeder Drive to Vinnedge Road
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Pimlico Court from
Whirlaway Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Schroeder Drive from
Niemoeller Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Tylersville Road east
of Five Points intersection
- Storm sewer installations,
phase 2.
- Complete. Est cost: $122,000.
Funding: CDBG.
- Weathered Oaks Court
from Weathered Oaks Lane to cul-de-sac
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
- Weathered Oaks Lane
from Summerdale Lane to Liberty Fairfield Road
- Resurfacing.
- Complete. Funding: Fairfield
Twp.
Hanover
Township
- Darrtown Road Bridge
#00.100
- Bridge replacement.
- Complete. Cost: $46,006.
Funding: State Issue 2, BCEO.
- Photo 1: Old bridge (Jan 03).
- Photo 2: School bus in sharp curve approaching
old bridge (Sep 03).
- Photo 3: School bus on narrow old bridge (Sep
03).
- Photo 4: Construction begins (September 2003).
- Photo 5: Construction - new Conspan to be placed
to right of old bridge (Oct 03).
- Photo 6: Construction - placing first section
of Conspan (Oct 03).
- Photo 7: Construction - first section of Conspan
in place (Oct 03).
- Photo 8: Construction - placing second section
of Conspan (Oct 03).
- Photo 9: Construction - placing wing wall (Oct
03).
- Photo 10: Construction - lifting second wing wall
off of truck (Oct 03).
- Millville, Village
of
- Storm sewer installations.
- Complete. Est cost: $54,000.
Funding: CDBG.
- Minton Road Bridge
#00.646
- Deck replacement.
- Complete. Cost: $60,741.
Funding: BCEO Force Account.
- Photo 1: Before construction. Top view. (Apr
03).
- Photo 2: Before construction. Side view. (Apr
03).
- Morman Road from Stahlheber
Road to Ohio 130
- Resurfacing.
- Complete. Est cost:
$76,885. Funding: BCEO.
- Morman Road from Ohio
130 to Stillwell Beckett Road
- Resurfacing.
- Complete. Funding: Hanover
Twp.
- Nichols Road culvert
between U.S. 27 and Lanes Mill Road
- Emergency culvert
replacement.
- Complete. Culvert washed
out due to heavy rains and flooding. Replacement by Hanover Twp
Maintenance Department.
- News
release.
- Oyler Drive from Plateau
Drive to dead end
- Resurfacing.
- Complete. Funding: Hanover
Twp.
- Plateau Drive from
Lanes Mill Road to dead end
- Resurfacing.
- Complete. Funding: Hanover
Twp.
- Stillwell Road Bridge
#04.000
- Bridge replacement.
- Complete.
Est
cost: $80,343. Funding: 50 % State Issue 2, 50% BCEO.
- News
release.
- Photo: Old bridge.
- Woodridge Drive from
Ohio 177 to dead end
- Resurfacing.
- Complete. Funding: Hanover
Twp.
Lemon
Township
- South Main Street
(Hamilton Middletown Road) at CSX Railroad
- Crossing repairs.
- Complete. Funding: CSX.
- Oxford State Road
at CSX Railroad
- Crossing replacement.
- Complete.
Funding:
CSX.
Liberty
Township
- Bahama Drive from
cul-de-sac to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Carthel Drive from
Liberty Fairfield Road to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Delano Drive from
Bahama Drive to Lynn Road
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Fiat Drive from Porsche
Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Hamilton Mason Road
Bridge #07.491
- Repair abutment.
- Complete. Funding: BCEO
Force Account.
- Photo: Abutment deterioration.
- Kyles Station Road
at Yankee Road
- Intersection improvement.
- Complete. Cost: $47,558.
Funding: BCEO.
- Photo 1:
Before construction. View north.
- Photo 2: Complete. View north.
- LeSourdsville West
Chester Road Culvert #03.306
- Culvert replacement.
- Complete.
Cost:
$6,547. Funding: BCEO Force Account.
- LeSourdsville West
Chester Road Culvert #05.077
- Culvert replacement.
- Complete. Cost: $7,051.
Funding: BCEO Force Account.
- Liberty Fairfield
Road at Millikin Road
- Intersection improvement:
add turn lanes and traffic signal.
- Complete. Cost: $459,760.13.
Funding: State Issue 2, BCEO Liberty Twp, Fairfield Twp.
- Construction notification to
local residents and businesses.
- Photo 1:
Before construction. View west.
- Photo 2: Construction. View east. (Nov 03).
- Liberty Fairfield
Road at Princeton Road
- Intersection improvement
- Add turn left lanes and signals, improve sight distance, cut
down hill and replace bridge west of intersection, raise profile
slightly on east side of intersection.
- Complete.
ODOT
managed construction phase. Cost: $883,411. Funding: Federal,
BCEO.
- Photo 1:
Intersection before construction. View west.
- Photo 2: Utility relocations. View south (Jun
02).
- Photo 3: Utility relocations. View south (Jun
02).
- Photo 4: Construction. View east. (Nov 02).
- Photo 5: Complete. View north. (2003).
- Photo 6: Complete. View east. (2003).
- Liberty Township Bikeway
- Phase 4 construction.
- Complete. BCEO administered
design and contruction. Cost: $296,000. Funding: Federal, Liberty
Twp.
- Lynch Drive from Millikin
Road to cul-de-sac
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Mauds Hughes Road
from Millikin Road to Kyles Station Road
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Mercedes Drive from
Ohio 747 to Ohio 4
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Myra Drive from Carthel
Drive to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Ohio 747 at Millikin
Road
- Intersection improvement
including turn lanes and signals.
- Complete. Some off-road
work continues. Final surface course of asphalt to be applied
in spring 04. Joint project of BCEO and ODOT: design plans completed
by BCEO. ODOT let construction contract. Cost: $812,000. Funding:
Federal, State.
- Photo 1: Intersection before construction. View
north (Apr 03).
- Photo 2: Intersection before construction. View
west (Apr 03).
- Photo 3: Complete. View north (Nov 03).
- Pauline Drive from
Lynch Drive to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Porsche Drive from
Mercedes Drive to Fiat Drive
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Princeton Road Culvert
#01.452
- Culvert replacement.
- Complete. Cost: $7,719.
Funding: BCEO Force Account.
- Princeton Road Culvert
#01.702
- Culvert replacement.
- Complete. Cost: $13,195.
Funding: BCEO Force Account.
- Princeton Road from
Ohio 747 to Mauds Hughes Road
- Resurfacing.
- Complete. Cost: $214,934.
Funding: BCEO.
- Shelby Drive from
Lynn Road to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Tracey Lane from Bahama
Drive to dead end
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Van Gordon Road from
Hamilton Mason Road to Princeton Road
- Resurfacing.
- Complete. Funding: Liberty
Twp.
- Yankee Road Extension
- New road: Extension
of Yankee east of Cincinnati Dayton Road.
- Complete. Cost: $882,195.
Funding: Butler County TIF.
Madison
Township
- April Circle from
Eck Road to cul-de-sac
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Blair Court from Mosiman
Road to dead end
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Connie Lane from Eck
Road to dead end
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Dalewood Drive from
dead end to dead end
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Dickey Road from West
Alexander Road to Kalbfleisch Road
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Howe Road Bridge #03.787
- Bridge replacement.
- Complete.
Est
cost: $64,926. Funding: 50 % State Issue 2, 50 % BCEO.
- News
release.
- Photo 1:
Old bridge.
- Photo 2: Old bridge - underside view.
- Photo 3: New bridge - top view (Nov 03).
- Photo 4: New bridge - side view (Nov 03).
- Michael Road from
Ohio 122 to West Alexandria Road
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Middletown Germantown
Road from Corlee Road to Preble County line
- Resurfacing.
- Complete. Est cost:
$193,246. Funding: BCEO.
- Mosiman Road from
Ohio 122 to dead end
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Sandra Lee Lane from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Thomas Road from Browns
Run Road to Sloebig Road
- Resurfacing.
- Complete. Funding: Madison
Twp.
- Trenton, City of
- Various handicap curb
ramp installations.
- Complete. Cost: $130,000.
Funding: State Block Grant.
- Winfield Drive from
Dalewood Drive to Trenton Franklin Road
- Resurfacing.
- Complete. Funding: Madison
Twp.
Milford
Township
- Bauer Road Culvert
#00.236
- Emergency culvert
replacement.
- Complete. Culvert washed
out due to heavy rains and flooding.
- News
release.
- Harris Road Culvert
#02.642
- Emergency culvert
replacement.
- Complete. Culvert washed
out due to heavy rains and flooding.
- News
release.
- Huston Road Bridge
#02.655
- Bridge replacement.
- Complete. Est cost:
$50,725. Funding: 50 % State Issue 2, 50% BCEO.
- News
release.
- Photo 1: Old bridge - side view (2002).
- Photo 2: Construction (2003).
- Photo 3: Complete (Nov 03).
- Ohio 73 bridge 0.8
mile east of Ohio 177
- Bridge repair.
- Complete. Cost: $654,262.
- Oxford Middletown
Road from U.S. 127 to 1.0 mile west of U.S. 127
- Resurfacing.
- Complete. Funding: Milford
Twp.
- State Road Bridge
#00.189
- Bridge replacement.
- Complete. Built as Design-Build
project. Cost: $657,864. Funding: Federal, BCEO.
- News
release.
- Photo 1: Old bridge - top view (2002).
- Photo 2: Old bridge - side view (2002).
- Photo 3: Old bridge - another side view (2002).
- Photo 4: Construction of new bridge (Mar 03).
- Photo 5: Construction - setting beam (Apr 03).
- Photo 6: Construction - setting beam (Apr 03).
- Photo 7: Construction - delivering beams (Apr
03).
- Photo 8: Construction - delivering beams a difficult
task backing across railroad (Apr 03).
- Photo 9: Construction - delivering beams a difficult
task backing across railroad (Apr 03).
- Photo 10: Construction - new beams in place on
half of bridge (Apr 03).
- Photo 11: Construction - setting beams (Apr 03).
- Photo 12: Construction - setting beams (April
2003).
- Photo 13: Construction - County Engineer Greg
Wilkens at construction site (Apr 03).
- Photo 14: Complete (May 03).
- Photo 15: Complete - side view (May 03).
- Photo 16: Complete - underside view (May 03).
Morgan
Township
- Chapel Road Culvert
#01.889
- Culvert replacement.
- Complete. Cost: $15,569.
Funding: BCEO Force Account.
- Chapel Road Culvert
#02.001
- Culvert replacement.
- Complete.
Cost:
$25,413. Funding: BCEO Force Account.
- Chapel Road Culvert
#03.012
- Culvert replacement.
- Complete. Cost: $11,500.
Funding: BCEO Force Account.
Oxford
Township
- Fairfield Road Bridge
#00.045 (over Indian Creek)
- Bridge replacement.
- Complete. Cost: $519,684.
Funding: Federal, BCEO.
- Photo 1: Old bridge - Top view.
- Photo 2: Old bridge - Side view.
- Photo 3: Construction (Jun 03).
- Photo 4: Construction (Jun 03).
- Photo 5: Construction - newly placed beams -
view west toward Indiana state line (Aug 03).
- Photo 6: Construction - newly placed beams (Aug
03).
- Photo 7: Construction - newly placed beams -
view west toward Indiana state line (Aug 03).
- Photo 8: Complete - view west (Dec 03)
- Photo 9: Complete - side view west (Dec 03)
- Photo 10: Complete - view east (Dec 03)
- Photo 11: Complete - side view east (Dec 03)
- Photo 12: Complete - view east from inside Indiana
state line (Dec 03)
- Fairfield Road between
Riggs Road and Hidden Creek Drive
- Emergency culvert
replacement.
- Complete.
- Riggs Road from Reily
Twp line to Brookville Road
- Resurfacing.
- Complete. Est cost:
$167,317. Funding: BCEO.
- Stillwell Beckett
Road Culvert #01.966
- Culvert replacement.
- Complete. Cost: $14,452.
Funding: BCEO Force Account.
- Stout Road Bridge
#00.110 (over branch of Indian Creek)
- Bridge replacement.
- Complete. Cost: $177,000.
Funding: 50% State Issue 2, 50% BCEO.
- News
release.
- Photo 1:
Old bridge.
- Photo 2: Construction - dismantling of old bridge
(Mar 03).
- Photo 3: Construction - dismantling of old bridge
- side view (Mar 03).
- Photo 4: Construction - new box beam bridge deck
and wing walls - side view (May 03).
- Photo 5: Construction - new box beam bridge deck
- top view (May 03).
- Photo 6: Complete (Jul 03).
- Stout Road from Hayworth
Road to CSX Railroad
- Resurfacing.
- Complete. Funding: Oxford
Twp.
Reily
Township
- Dunwoody Road from
Hart Road to Ohio 732
- Resurfacing.
- Complete. Funding: Reily
Twp.
- North Law Road between
Nichols Road and Booth Road
- Emergency culvert
replacement.
- Complete.
- Reily Millville Road
Culvert #01.817
- Culvert replacement.
- Complete. Funding: BCEO.
- Reily Millville Road
Culvert #02.671
- Culvert replacement.
- Complete. Funding: BCEO.
Ross
Township
- Acer Drive from Silax
Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Ross
Twp.
- Boulder Drive from
Rocky Hill Drive to Herman Road
- Resurfacing.
- Complete. Funding: Ross
Twp.
- Celtis Court from
Silax Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Ross
Twp.
- Hine Road Bridge #
00.510
- Bridge replacement.
- Complete. Built as Design-Build
project. Cost: $311,362. Funding: Federal, BCEO.
- News
release.
- Photo 1:
Old bridge - top view (Jun 02).
- Photo 2:
Old bridge - top side view (Jun 02).
- Photo 3:
Construction - setting beams (Apr 03).
- Photo 4:
Construction - setting beams (Apr 03).
- Photo 5:
Construction - setting beams (Apr 03).
- Photo 6:
New bridge (May 03).
- Millville, Village
of
- Storm sewer installations.
- Complete. Est cost: $54,000.
Funding: CDBG.
- Rocky Hill Drive from
Boulder Drive to dead end
- Resurfacing.
- Complete. Funding: Ross
Twp.
- Sandy Hills Drive
from Boulder Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: Ross
Twp.
St.
Clair Township
- Jackson Road at CSX
Railroad
- Crossing repairs.
- Complete. Funding: CSX.
- Riverside Drive from
Trenton Road to Busenbark Road
- Resurfacing.
- Complete. Est cost:
$225,041. Funding: BCEO.
- Seven Mile, Village
of
- Sidewalk replacement.
- Complete. Est cost: $145,000.
Funding: CDBG.
- Spring Road at N&S
Railroad
- Crossing repairs.
- Complete. Funding: N&S.
Wayne
Township
- Cotton Run Road from
Tolbert Road to Mill Road
- Resurfacing.
- Complete. Funding: Wayne
Twp.
- Photo: Complete - view north from Tolbert.
(Oct 03).
- Paullin Drive from
Ohio 744 to Jacksonburg Road
- Resurfacing.
- Complete. Funding: Wayne
Twp.
- Seven Mile, Village
of
- Sidewalk replacement.
- Complete. Est cost: $145,000.
Funding: CDBG.
- Tolbert Road Bridge
#00.427
- Emergency bridge repairs.
- Complete. Damage due
to heavy rains due to flash flooding.
- Photo: Complete. Repairs along roadside of
bridge where washout occurred. View east (Nov 03).
West
Chester Township
- Absaroka Court from
Bodford Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Allen Road overpass
at I-75
- Bridge replacement
in conjunction with I-75 widening project.
- Complete. See I-75 below.
- Photo 1: Overpass demolition - top view (Mar
03).
- Photo 2: Overpass demolition - side view (Mar
03).
- Photo 3: Overpass demolition - another top view
(Mar 03).
- Photo 4: Complete (Oct 03).
- Allen Road at Union
Centre Boulevard
- Intersection improvement
- Mast arm signalization, vertical adjustments to Allen Road,
turn lane addition on UCB.
- Complete. Cost: $415,116.
Funding: West Chester Twp TIF.
- Photo 1:
Before construction (2003).
- Ashley Oaks Court
from Paddington Court to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Brandywine Lane from
Meadowridge Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Charter Park Drive
from Centre Park Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Churchview Drive from
Topridge Drive to Bach Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Coachlight Way from
Hunters Ridge Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Cox Road from Tylersville
Road to Hamilton Mason Road
- Roadway improvement
-- Widen to five lanes; addition of multiple turn lanes.
- Complete. Cost: $5.5
million. Funding: Butler County TIF.
- Photo 1:
Complete. View south (Jun 03).
- Photo 2:
Complete. View south (Jun 03).
- Creekstone Drive from
Willowood Drive to Falling Woods Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Crescentville Road
overpass at I-75
- Bridge replacement
in conjunction with I-75 widening project.
- Complete. See I-75 below.
- Photo: Construction of new overpass. View east
(Nov 03).
- Crescentville Road
from Ohio 747 to Centerdale Drive
- Resurfacing.
- Complete. Project in
conjunction with Cities of Springdale and Sharonville. Est cost:
$62,309 (BCEO portion), $76,746 (Sharonville and Springdale portions).
- Photo: Complete. View west toward Ohio 747
(Nov 03).
- Devonwood Drive from
Bach Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Dimmick Road from
U.S. 42 to Iris Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Falling Woods Drive
from cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Fox Hunt Drive from
Hunters RIdge Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Gail Sue Drive from
Gina Drive to Hadley Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Gina Drive from Dimmick
Road to Gail Sue Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Hamilton Mason Road
Bridge #07.491
- Repair abutment.
- Complete. Funding: BCEO
Force Account.
- Photo: Abutment deterioration.
- Hopi Drive from Kennesaw
Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Hunters Ridge Drive
from Fountains Boulevard to Tylersville Road
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- I-75 from Tylersville
Road south to Sharon Road in Hamilton County
- Widen from 6 to 8
lanes and improve interchange at I-275.
- Completion:
2005. ODOT project. Contract let September 25, 2002. Under construction
eff. January 2003. Project involves closure of several overpasses,
including Crescentville Road, Allen Road, and West Chester Road.
See Construction
Notices
for details.
- Photo: Construction. View north from Crescentville
Road overpass (Nov 03).
- Inverness Court from
Hadley Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Iris Drive from Dimmick
Road to Woody Hollow Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Kennesaw Drive from
Tylersville Road to #7912
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Jennifer Lynn Drive
from Timberknoll Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Maddox Drive from
Wells Crossing to #8216
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Mauds Hughes Road
from Cincinnati Dayton Road to Hamilton Mason Road
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Meadowlark Drive from
Barret Road to Wells Crossing
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Meadowridge Drive
from Ambleside Drive to curb beginning
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Muhlhauser Road from
Ohio 4 to Ohio 747 (City of Fairfield to West Chester Twp)
- Roadway improvement
-- Widen to five lanes, construct railroad overpass, and reconstruct
of Mack/Muhlhauser/Ohio 4 intersection.
- Completion:
summer 2004. Project in conjunction with City of Fairfield. Est
cost: $11,652,343. Funding: Federal and State Issue 2 grants,
BCEO.
- Photo 1: Construction. View west on Muhlhauser
(Nov 03).
- Photo 2: Construction. View north on SR 4 toward
Muhlhauser intersection (Nov 03).
- Photo 3: Construction of new Muhlhauser overpass
over Fairfield Business Drive (Nov 03).
- Photo 4: Construction of Muhlhauser railroad
overpass. View west (Nov 03).
- Photo 5: Construction of Muhlhauser railroad
overpass. View north (Nov 03).
- Photo 6: Construction of Muhlhauser railroad
overpass. View east (Nov 03).
- Photo 7: Construction of Muhlhauser railroad
overpass. View east (Nov 03).
- Photo 8: Construction of Muhlhauser railroad
overpass. View east (Nov 03).
- Photo 9: Construction. Side view of Muhlhauser
railroad overpass wall. (Nov 03).
- North Pisgah Drive
from U.S. 42 to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Oakcreek Court from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Paddington Court from
cul-de-sac to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Placid Drive from
Windy Knoll Drive to Dimmick Road
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Port Union Road from
Fairfield corp. to Ohio 747
- Roadway improvement
-- Widen to three lanes; cut down hill and improve alignment;
replace bridge.
- Complete. Cost: $1.7
million. Funding: State Issue 2, BCEO, West Chester Twp.
- News
Release.
- Photo 1:
View east from near LeSaint Drive (Feb 02).
- Photo 2:
Approaching west end of project traveling east (Feb 02). New
road will look like this portion in Fairfield. Hill in distance
to left of picture will be cut down.
- Photo 3:
Utility relocations near Gold Park Drive and Ohio 747 (Febr 02).
- Photo 4:
Cutting down the hill, western end of project. View east. (Jun
02).
- Photo 5: Completed project. View west. (June
2003).
- Rialto Road from Ohio
747 to Port Union Rialto Road
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Siebert Court from
Absaroka Court to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Staffordshire Court
from Kennesaw Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Sterling Drive from
Wendel Drive to school sidewalk
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Sundance Circle from
Hamilton Mason Road to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Timberknoll Drive
from #7262 to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Timbermist Court from
Placid Drive to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Toddy Drive from Cox
Road to Meadow View Drive
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Topridge Drive from
Tylersville Road to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Tylers Circle from
Tylers Crossing to cul-de-sac
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- Tylers Place Boulevard
- Rebase and resurfacing.
- Complete. Est cost:
$30,000.
- VOA Park
- Construction of 38-acre
lake for Butler County MetroParks.
- Complete. Cost: $2,298,748.
Funding: MetroParks Board.
- Photo 1:
Lake construction (Sep 03)
- Photo 2:
Lake construction (Sep 03)
- Photo 3:
Lake construction (Sep 03)
- Photo 4:
Lake construction (Sep 03)
- Photo 5:
Lake construction (Sep 03)
- Wells Crossing from
Shadywell Court to #8216
- Resurfacing.
- Complete. Funding: West
Chester Twp.
- West Chester Road
overpass at I-75
- Bridge replacement
in conjunction with I-75 widening project.
- Complete. See I-75 above.
- West Chester Road
from Cincinnati Dayton Road to Barret Road
- Resurfacing.
- Complete. Est cost:
$61,322. Funding: BCEO.
- West Chester Road
from U.S. 42 to Butler Warren Road
- Resurfacing.
- Complete. Est cost:
$86,324. Funding: BCEO.
- West Chester Road
west of Barret Road
- Stream bank erosion
repairs.
- Complete. Funding: BCEO.
- Windwood Drive from
U.S. 42 to Amberwood Court
- Resurfacing.
- Complete. Funding: West
Chester Twp.
All Townships
- Resurfacing of various
township roads - Most listed above.
- Complete.
- County and township
centerline and edgeline striping/retracing
- Complete. Cost: $50,000.
Funding: BCEO.
- Mowing and weed spray
program
- Seasonal
/ ongoing. No road closures. Funding: BCEO.
- Ditching
- Seasonal
/ ongoing. No road closures. Funding: BCEO.
Project