Completed Projects - 2006

Last updated: December 28, 2006


• Additional source: 2006 Capital Improvements Report

 

Select a township by clicking on it.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County roads Centerline and edgeline restriping / retracing COMPLETE. Cost: $240,766. Funding: BCEO
Photo
Various County roads Installation of raised pavement markers COMPLETE. Cost: $54,955. Funding: Federal LPA
Photo
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALLISON AVE culvert Replacement (replace culvert w/ bridge) COMPLETE. Funding: Ffd Twp
ANN ELISE CT - Millcrest Dr to cul-de-sac Resurfacing COMPLETE. Funding: Ffd Twp
BROOKE MEADOWS CT - cul-de-sac to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp 
CANAL RD - Headgates Rd to dead end Resurfacing  COMPLETE. Funding: Ffd Twp 
CASSANDRA CT - Penelope Dr to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
CATHLEEN CT - Dawn Dr to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
DAWN DR - #3520 to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
EAST RIDGE AVE culvert  Replacement (replace culvert w/ bridge) COMPLETE. Funding: Ffd Twp
ELENOR DR - Mindy Dr to Penelope Dr  Resurfacing  COMPLETE. Funding: Ffd Twp
HAMILTON MASON RD at LIBERTY FAIRFIELD RD Signalization  COMPLETE. Est cost: $75,000.
Funding: BCEO
Photo: New signals - view east
Photo: Advance warning signs - view west
 
HICKORY GLEN DR - Jenny Marie Crest to Liberty Fairfield Rd Resurfacing  COMPLETE. Funding: Ffd Twp
JENNY MARIE CREST - cul-de-sac to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
LIBERTY FAIRFIELD RD - Ohio 4 to Great Miami River bridge Resurfacing COMPLETE. Est cost: $92,000. Funding: BCEO
MILLCREST DR - #4079 to Hickory Glen Resurfacing  COMPLETE. Funding: Ffd Twp
MINDY DR - Millikin Rd to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
OLD HICKORY DR - Ann Elise Ct to Crest Manor Dr  Resurfacing  COMPLETE. Funding: Ffd Twp
OLD LINE LN - Headgates Rd to dead end Resurfacing  COMPLETE. Funding: Ffd Twp
PENELOPE DR - Elenor Dr to cul-de-sac  Resurfacing  COMPLETE. Funding: Ffd Twp
RIVER RD Bridge #00.722 Deck replacement COMPLETE. Cost: $59,287. Funding: BCEO FA
Photo: Construction - removing old deck
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
DARRTOWN RD - Stillwell Beckett Rd to Nichols Rd Resurfacing COMPLETE. Funding: Han Twp
GREEN ACRES CT - Greenlea Dr to cul-de-sac Resurfacing COMPLETE. Funding: Han Twp
GREENLEA DR - Ohio 129 to dead end Resurfacing COMPLETE. Funding: Han Twp
HANOVER TWP PARK - Morman Rd Pave parking lot and hike path COMPLETE. Funding: Han Twp
MERLE AV - Vanda Av to Stahlheber Rd Resurfacing COMPLETE. Funding: Han Twp
OHIO 129 - culvert two miles west of Millville corp line Replacement COMPLETE. ODOT project.
OHIO 177 - at Nichols Rd Culvert replacement & improvements to intersection COMPLETE. ODOT project.
STILLWELL RD Bridge #03.315 Replacement COMPLETE. Est cost: $425,000. Funding: BCEO. To be built as Design-Build.
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction - view east
Photo: Construction - side view
Photo: Construction - view west
Photo: Complete - top view west
Photo: Complete - top view east
Photo: Complete - side view
Photo: Complete - side view
Photo: Complete - underside view
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
None
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CINCINNATI DAYTON RD - Cimmeron Dr to Millikin Rd Roadway improvement - widen to 3 lanes, new storm sewer system Under construction eff May 2. Completion: summer 07. Cost: $4,252,476. Funding: Federal LPA, BCEO
News release.
Photo:
Old roadway
Photo: Old roadway
Photo: Old roadway through Bethany
Photo: Old roadway through Bethany
Photo: Old roadway through Bethany
Photo: Old roadway through Bethany
Photo: Construction - view south from Millikin Rd
Photo: Construction - view south from Millikin Rd
Photo: Construction - view north from Princeton Rd
Photo: Construction - view north from Princeton Rd
Photo: Construction - view north from Princeton Rd
Photo: Construction - view north from Bethany Rd
CINCINNATI DAYTON RD at CEDARCREST DR Turn lane addition COMPLETE. Funding: pvt, assessment
CINCINNATI DAYTON RD at KYLES STATION RD Signalization COMPLETE. Est cost: $75,000. Funding: BCEO
Photo: Before - view south
Photo: New signals - view west
EDAM CT - Wooden Shoe Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
GRETEL CT - Tulip Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
HAMILTON MASON RD at LIBERTY FAIRFIELD RD Signalization COMPLETE. Est cost: $75,000. Funding: BCEO
Photo: New signals - view east
Photo: Advance warning signs - view west
HANSBRINKER CT - Hansbrinker Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
HANSBRINKER DR - Tulip Ln to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
KYLES STATION RD at N&S RR underpass Repairs to underpass walls Under construction eff Nov 27. Completion: Feb 07. Funding: N&S
LIBERTY FAIRFIELD RD - Ohio 4 to Great Miami River bridge Resurfacing COMPLETE. Est cost: $92,000. Funding: BCEO
LIBERTY WOODS CT - Liberty Woods Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
LIBERTY WOODS DR - Kyles Station Rd to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
MARKEN CT - Hansbrinker Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
MAUDS HUGHES RD - N&S RR bridge to Millikin Rd Resurfacing COMPLETE. Funding: Lib Twp
MILLIKIN RD Bridge #08.109 Replacement (replace bridge w/ culvert) COMPLETE. Cost: $99,734. Funding: BCEO FA
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete - top view
Photo: Complete - side, inlet
Photo: Complete - side, outlet
PRINCETON RD at LESOURDSVILLE WEST CHESTER RD Intersection improvement - turn lanes, signalization, improve roadway to east and south of intersection COMPLETE. Cost: $686,075. Signal cost: $98,900. Funding: BCEO, Federal LPA (signal portion only)
Photo: Before - view north
Photo: Before - view east
Photo: Construction nearing completion - view north
Photo: Construction nearing completion - view west
SILVER SKATE DR - Hansbrinker Dr to Cobblers Tr Resurfacing COMPLETE. Funding: Lib Twp
TULIP CT - Silver Skate Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
TULIP LN - Silver Skate Dr to Hansbrinker Dr Resurfacing COMPLETE. Funding: Lib Twp
WOODEN SHOE CT - Wooden Shoe Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
WOODEN SHOE DR - Hansbrinker Dr to cul-de-sac Resurfacing COMPLETE. Funding: Lib Twp
YANKEE RD at CINCINNATI DAYTON RD - Phase 2 Yankee Extension Project, Phase 2. Roadway improvements - lane addition to Cin Day, widen Yankee Rd to 5 lanes west of Cin Day tapering to 3 lanes approaching Dutchland, new and upgraded signals COMPLETE. Project in conjunction w/ shopping development. Begun in 2005. Completed 2006. Cost: $1,689,035. Funding: Butler County TIF
Photo: Construction - Cin Day lane addition, view north
Photo: Construction - Cin Day lane addition, view south
Photo: Construction - Cin Day lane addition, view south
Photo: Construction - Yankee Rd widening, view west
Photo: Construction - Yankee Rd widening, view west
Photo: Construction - new Liberty One Dr at Cin Day Rd
Photo: Nearing completion - Cin Day Rd - view north toward Yankee
Photo: Complete - Yankee Rd, view west
YANKEE RD at CINCINNATI DAYTON RD - Phase 3 Yankee Extension Project, Phase 3. Construction of new streets in conjunction w/ new hospital complex and Lakota East HS COMPLETE. Cost: $1,849,413. Funding: Butler County TIF
Photo: Construction - new Lakota Ln skirts Lakota East HS parking lot
Photo: Construction - new Liberty One Dr east of Lakota Ln
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CEDAR GLEN WAY - Cloister Cliffs Dr to dead end Resurfacing COMPLETE. Funding: Mad Twp
CLOISTER CLIFFS DR - Thomas Rd to Sloebig Rd Resurfacing COMPLETE. Funding: Mad Twp
ECK RD - Mosiman Rd to Howe Rd Resurfacing COMPLETE. Funding: Mad Twp
ELK CREEK RD Culvert #01.382 Replacement COMPLETE. Cost: $8,713. Funding: BCEO FA
ELK CREEK RD Culvert #03.854 Replacement COMPLETE. Cost: $11,333. Funding: BCEO FA
Photo: New culvert
ELK CREEK RD - Howe Rd to Ohio 122 Resurfacing COMPLETE. Est cost: $203,000. Funding: BCEO
HETZLER RD - Michael Rd to Hinkle Rd Resurfacing  COMPLETE. Funding: Mad Twp 
OAKCROFT CIR - Cloister Cliffs Dr to dead end Resurfacing  COMPLETE. unding: Mad Twp 
WOODSDALE RD Culvert #01.336 Replacement COMPLETE. Cost: $14,531. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: New culvert
WOODSDALE RD Culvert #01.630 Replacement COMPLETE. Cost: $4,232. Funding: BCEO FA
WOODSDALE RD Culvert #02.011 Replacement COMPLETE. Cost: $4,549. Funding: BCEO FA
WOODSDALE RD - Wayne Madison Rd to Trenton corp Resurfacing COMPLETE. Est cost: $305,000. Funding: BCEO
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HARRIS RD - east of Ohio 177 to Hamilton Eaton Rd Resurfacing COMPLETE. Funding: Mil Twp
MILFORD TWP COMMUNITY CENTER - parking lot Resurfacing COMPLETE. Funding: state CDBG
OXFORD MILFORD RD - Ohio 73 to Harris Rd Resurfacing COMPLETE. Funding: Oxf Twp
SOMERVILLE RD Culvert #02.636 Replacement COMPLETE. Cost: $22,720. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
SOMERVILLE RD Culvert #02.834 Replacement COMPLETE. Cost: $15,740. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: New culvert - inlet side
Photo: New culvert - outlet side
SOMERVILLE RD - Ohio 732 (Oxf Twp) to Ohio 177 Resurfacing COMPLETE. Est cost: $296,000. Funding: BCEO
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD Bridge #04.418 Replacement COMPLETE. Est cost: $95,000. Funding: BCEO FA
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction - tearing out old bridge
Photo: Construction - setting beams
Photo: Construction - setting beams
BELL RD - Jenkins Rd to Layhigh Rd Resurfacing COMPLETE. Funding: Mor Twp
CHAPEL RD Culvert #03.985 Replacement COMPLETE. Cost: $25,776. Funding: BCEO FA
Photo: Old culvert - top view and inlet channel
Photo: Old culvert - side view
Photo: New culvert
CHAPEL RD Culvert #04.152 Repairs COMPLETE. Cost: $1,630. Funding: BCEO FA
CHAPEL RD Culvert #04.418 Replacement COMPLETE. Cost: $22,893. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Outlet channel
Photo: New culvert - outlet
Photo: New culvert - catch basin
CHAPEL RD - Jenkins Rd to Ohio 129 Resurfacing COMPLETE. Est cost: $137,000. Funding: BCEO
LAYHIGH RD - I&E RR to North Wynn Rd Resurfacing COMPLETE. Funding: Mor Twp
NEW HAVEN RD Culvert #00.850 Replacement COMPLETE. Cost: $5,528. Funding: BCEO
NEW HAVEN RD - Ohio 126 to Hamilton Co line Resurfacing COMPLETE. Funding: BCEO
SCHOENLING RD - California Rd to Indiana state line Resurfacing COMPLETE. Funding: Mor Twp
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
OHIO 732 Bridge over Four Mile Creek Replacement COMPLETE. ODOT project.
OHIO 732 culvert near Hueston Woods Replacement COMPLETE. ODOT project.
OXFORD MILFORD RD - Ohio 73 to Harris Rd Resurfacing COMPLETE. Funding: Oxf Twp
RINGWOOD RD at CSX Railroad Crossing replacement COMPLETE. Funding: CSX
Photo: Crossing before replacement
Photo: Crossing before replacement
Photo: Crossing before replacement
Photo: Crossing after replacement
Photo: Crossing after replacement
SOMERVILLE RD - Ohio 732 to Ohio 177 (Mil Twp) Resurfacing COMPLETE. Est cost: $296,000. Funding: BCEO
STOUT RD at CSX Railroad Crossing repairs COMPLETE. Funding: CSX
Photo: Crossing before repairs
Photo: Crossing before repairs
Photo: Crossing before repairs
Photo: Crossing after repairs
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HARLEY RD - Stephenson Rd to Stillwell Beckett Rd Resurfacing COMPLETE. Funding: Rly Twp
INDIAN CREEK RD Bridge #01.360 Deck repairs COMPLETE. Funding: BCEO FA
NICHOLS RD - North Law Rd to Hanover Twp line Resurfacing COMPLETE. Funding: Rly Twp
NORTH LAW RD Culvert #00.589 Replacement COMPLETE. Cost: $10,874. Funding: BCEO FA.
NORTH LAW RD Culvert #00.696 Replacement COMPLETE. Cost: $11,634. Funding: BCEO FA.
OHIO 732 Bridge over Little Indian Creek Replacement COMPLETE. ODOT project.
STILLWELL BECKETT RD at WOODS STATION & NORTH PIERSON RD Intersection improvement COMPLETE. Cost: $575,508. Funding: State OPWC, BCEO.
News release.

Image: View project plan overlay on aerial photo
Photo: Construction - view west
Photo: Construction - view west
Photo: Construction - view west
Photo: Construction - old road
Photo: Construction - view east
Photo: Construction - view east
Photo: Construction - view east
Photo: Complete - view west
Photo: Complete - view west
Photo: Complete - view east
Photo: Complete - view east
Photo: Complete - Woods Stn Rd new approach to Stillwell Beckett
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BLACK RD - Hamilton New London Rd to Ross Hanover Rd Pavement repairs COMPLETE. Funding: Ros Twp
HAMILTON NEW LONDON RD Culvert #02.378 Replacement COMPLETE. Est cost: $20,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Outlet channel
HAMILTON NEW LONDON RD - U.S. 27 to Hamilton corp Resurfacing COMPLETE. Cost: $7,566. Funding: BCEO
HINE RD - Smith Rd to Ohio 128 Resurfacing COMPLETE. Funding: Ros Twp
KIRCHLING RD - Ohio 748 to U.S. 27 Resurfacing COMPLETE. Funding: Ros Twp
KRAUS LN - Ohio 128 to dead end Resurfacing COMPLETE. Funding: Ros Twp
OHIO 129 - culvert two miles west of Millville corp line Replacement COMPLETE. ODOT project.
SKY MEADOW DR culverts 2 culvert replacements COMPLETE. Cost: $88,680. Structure funding: Ross Twp, St Clair Twp. Construction: BCEO FA
Photo: Clv #00.354 - old - side view
Photo: Clv #00.354 - new - top view
Photo: Clv #00.354 - new - inlet
Photo: Clv #00.392 - old - top view
Photo: Clv #0.392 - old - side view
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction and temp road
Photo: Clv #0.392 - new - top view
Photo: Clv #0.392 - new - side inlet view
Photo: Clv #0.392 - new - side outlet view
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
AUGSPURGER RD at CSX Railroad Crossing replacement COMPLETE. Funding: CSX
EATON RD - North of Brooks Rd Ditch realignement and roadway safety improvement COMPLETE. Cost: $137,095. Funding: BCEO
Photo: Sharp drop-off - view south
Photo: Another view south - embankment and guardrail slippage
Photo: Guardrail slippage
Photo: Complete - view south
Photo: Complete - view north
HAMILTON TRENTON RD at N&S Railroad Crossing replacement COMPLETE. Funding: N&S
JACKSON RD at CSX Railroad (south crossing) Crossing repairs COMPLETE. Funding: CSX
JACKSON RD at CSX Railroad (north crossing) Crossing replacement COMPLETE. Funding: CSX
RIVERSIDE DR - Caldwell St to Trenton Rd Resurfacing COMPLETE. Est cost: $63,000. Funding: BCEO
SKY MEADOW DR culverts 2 culvert replacements COMPLETE. Cost: $88,680. Structure funding: Ross Twp, St Clair Twp. Construction: BCEO FA
Photo: Clv #00.354 - old - side view
Photo: Clv #00.354 - new - top view
Photo: Clv #00.354 - new - inlet
Photo: Clv #00.392 - old - top view
Photo: Clv #0.392 - old - side view
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction
Photo: Clv #0.392 - construction and temp road
Photo: Clv #0.392 - new - top view
Photo: Clv #0.392 - new - side inlet view
Photo: Clv #0.392 - new - side outlet view
SEVEN MILE, VILLAGE OF - Ritter St Sidewalk replacement COMPLETE. Est cost: $50,000. Funding: State CDBG
TAYLOR SCHOOL RD - Seven Mile corp to Jacksonburg Rd Resurfacing COMPLETE. Est cost: $147,000. Funding: BCEO
U.S. 127 - in front of New Miami school Sidewalk replacement COMPLETE. Est cost: $50,000. Funding: State CDBG
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HOWE RD - Jacksonburg Rd to wayne Madison Rd Resurfacing COMPLETE. Funding: Way Twp
SEVEN MILE, VILLAGE OF - Ritter St Sidewalk replacement COMPLETE. Est cost: $50,000. Funding: State CDBG
TAYLOR SCHOOL RD - Seven Mile corp to Jacksonburg Rd Resurfacing COMPLETE. Est cost: $147,000. Funding: BCEO
TOLBERT RD - Wayne Milford Rd to Ohio 503 Resurfacing COMPLETE. Funding: Way Twp
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALLEN RD at RIVER WALK DR (new) Turn lanes on Allen Rd COMPLETE. Funding: WC Twp TIF
BECKETT RD at MILL CREEK DR Turn lane addition COMPLETE. Funding: BCEO
Photo: Complete - view south
Photo: Complete - view from Mill Creek Dr
BECKETT RIDGE BLVD - Beckett Rd to Deer Path Resurfacing COMPLETE. Funding: WC Twp
BLUEBIRD DR - Barret Rd to Bluebird Ct Resurfacing COMPLETE. Funding: WC Twp
CASCARA DR - Revere Run to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
CENTRE POINTE Construction of streets and lake in conjunction w/ new park, addition of roundabout, sanitary sewer construction COMPLETE. Cost: $1,453,313. Funding: WC Twp TIF
Photo: Construction - view west toward new roundabout
Photo: Construction - view at new roundabout
Photo: Construction - view west toward new roundabout
Photo: Construction - view south from new roundabout
Photo: Construction - new lake for park
Photo: Construction nearly complete - new lake for park
CHARLEMONT CT - Rolling Meadows to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
CHARTER OAK CT - Cox Rd to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
CINCINNATI DAYTON RD - Mauds Hughes Rd to Eagles Wing Dr Resurfacing COMPLETE. Est cost: $33,000. Funding: BCEO
COACHMAN DR - Monticello Dr to Shenandoah Ct Resurfacing COMPLETE. Funding: WC Twp
COMMANCHE DR - Glenn Moor Dr to curb Resurfacing COMPLETE. Funding: WC Twp
DIMMICK RD - Cin Day Rd to Windwood Dr Resurfacing COMPLETE. Funding: WC Twp
DIMMICK RD at N&S Railroad Crossing replacement COMPLETE. Funding: N&S
FENCE ROW - Butterfly Wy to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
FIRE PL - Butterfly Wy to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
HADLEY DR - Jerry Dr to Kircaldy Dr Resurfacing COMPLETE. Funding: WC Twp
HAMILTON MASON RD at LIBERTY FAIRFIELD RD Signalization COMPLETE. Est cost: $75,000. Funding: BCEO
Photo: New signals - view east
Photo: Advance warning signs - view west
KIRCALDY DR - Hadley Dr to Inverary Ct Resurfacing COMPLETE. Funding: WC Twp
LAKE LAKOTA CR - Lakeridge Dr to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
LAKE SPRING CT - Lake Lakota Cr to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
LAKEPARK DR - Lakeshore Dr to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
LAKERIDGE DR - Lakepark Dr to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
MUHLHAUSER RD at ALLEN RD Intersection improvement - add turn lanes, upgrade signals COMPLETE. Cost: $509,292. Funding: Ohio Dept. of Development thru WC Twp
Photo: Before - view SE down Allen
Photo: Construction - view SE down Allen
Photo: Construction - view SE down Allen
Photo: Construction - view NW up Allen
Photo: Construction nearly complete - view NW up Allen
NORDAN DR - Cascara Dr to sidewalk area Resurfacing COMPLETE. Funding: WC Twp
OREGON PASS - #6484 to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
PULLMAN CT - Oregon Pass to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
QUIET TIME PL - Fence Row to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
RED CEDAR LN - Revere Run to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
RIALTO RD at N&S Railroad Crossing repairs COMPLETE. Funding: N&S
ROLLING MEADOWS - #7430 to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
SHENANDOAH CT - cul-de-sac to cul-de-sac Resurfacing COMPLETE. Funding: WC Twp
STATION RD at N&S Railroad Crossing repairs COMPLETE. Funding: N&S
SUNDERLAND WY - Hadley Dr to Inverary Ct Resurfacing COMPLETE. Funding: BCEO
VENTLE DR - Trailwood Ct to Shadybrook Dr Resurfacing COMPLETE. Funding: WC Twp
VILLAGE AT THE STREETS OF WEST CHESTER Construction of new streets and tie-in with Allen Rd COMPLETE. Cost: $590,410. Funding: WC Twp TIF
WINDWOOD DR - Dimmick Rd to Gatewood Ct Resurfacing COMPLETE. Funding: WC Twp