Completed Projects - 2008
 
2008 Projects by Township

Last updated: December 30, 2008

 

Select a township by clicking on the map below.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County and township roads Centerline and edgeline restriping / retracing COMPLETE. Est cost: $340,363. Funding: BCEO, Twps
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BUTTONWOOD CT - Jayfield Dr to cul-de-sac Resurfacing COMPLETE. Funding: Ffd Twp
GEORGETOWN RD - River Rd to Ham Co line Resurfacing COMPLETE. Funding: Ffd Twp
HAMILTON MASON RD at LIBERTY FAIRFIELD and VINNEDGE RDS Intersection improvement - Relocate Lib Ffd to align w/ Vinnedge at Ham Mason, install roundabout COMPLETE. Cost: $998,752. Funding: State OPWC, BCEO
News release.

Simplified project schematic.
Image: Aerial diagram of project
Image: Project plan overlay on aerial photo
Photo: Aerial - original view south
Photo: View west of roundabout construction
Photo: Construction - new section of Lib Ffd toward Ham Mason Rd
Photo: Construction - new roundabout in place
Photo: Construction - splitter island stamping
Photo: Construction - view north new section Lib Ffd Rd
Photo: Construction - view south from new Lib Ffd Rd
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial view south
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial close-up
Photo: Complete - view NW
Photo: Complete -old and new sections of Lib Ffd
Photo: Complete - sign approaching from north
Photo: Complete - view NW
INDIAN MEADOWS Resurfacing COMPLETE. Funding: Ffd Twp
JAYFIELD DR - Princeton Rd to Carrington Wy Resurfacing COMPLETE. Funding: Ffd Twp
LEEWARD CT - Jayfield Dr to cul-de-sac Resurfacing COMPLETE. Funding: Ffd Twp
LENOX AV Storm sewer installation COMPLETE. Cost: $90,375. Funding: Fed CDBG, Ffd Twp
LIBERTY FAIRFIELD RD Bridge #03.803 (over Great Miami River) Replacement and roadway realignment Under construction eff Mar 08. Completion: 09. No closures until 09. Cost: $10,312,716. Funding: Federal, State, BCEO
News release.

Image: View project plan overlay on aerial photo
Photos: Click for Lib Ffd Rd Bridge photos page
LIBERTY FAIRFIELD RD Culvert #00.733 Rehab / maintenance COMPLETE. Funding: BCEO FA
MORRIS RD - Hamilton Msaon to Rivaridge Dr Resurfacing COMPLETE. Funding: Ffd Twp
OHIO 4 - North Eastview Pkwy to Fairham Rd Roadway improvement - Widening, improve drainage COMPLETE. ODOT project.
OHIO 4 at Headgates Rd Roadway improvement - add turn lane COMPLETE. ODOT project.
PRINCETON RD - west of Walden Ponds Circle to Bypass 4 Roadway improvement - intersection improvements, additional lanes, signalization COMPLETE. Phase 2 of Princeton/Gilmore Rd improvements. Cost: $3,096,840. Funding: Ffd Twp TIF
News release.

Photo: Original roadway - view east from Birdy Dr
Photo: Original roadway - view west from Birdy Dr
Photo: Original roadway - view east from Walden Ponds Cir
Photo: Construction - view east from Walden Ponds Cir
Photo: Construction - view west from Walden Ponds Cir
Photo: Construction - view west from Gilmore Rd
Photo: Construction - view east toward Winford Dr
Photo: Construction - profile of roadway lowered at Birdy Dr
Photo: Construction - view west from Winford Dr
Photo: Complete - view west from Gilmore Rd
Photo: Complete - view east
Photo: Complete - new signals at Gilmore intersection
SHADY MEADOWS Resurfacing COMPLETE. Funding: Ffd Twp
TAMMY RAE CT - Jayfield Dr to cul-de-sac Resurfacing COMPLETE. Funding: Ffd Twp
VINNEDGE RD - Seward Rd to dead end Resurfacing COMPLETE. Funding: Ffd Twp
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
DARRTOWN RD Culvert #01.793 Replace culvert w/ bridge COMPLETE. Cost: $72,700. Funding: BCEO FA, Hanover Twp
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - outlet side
Photo: New culvert - outlet side
DARRTOWN RD - Ohio 130 to dead end Resurfacing (chip seal) COMPLETE. 1.0 mile. Est cost: $25,750. Funding: Han Twp
HANOVER TWP PARK Parking lot expansion COMPLETE. Funding: State CDBG
LANES MILL RD - Ohio 130 to Nichols Rd Resurfacing COMPLETE. 1.8 miles. Est cost: $199,660. Funding: BCEO
MORMAN RD Bridge #04.934 (over Stony Run branch) Rehabilitation COMPLETE. Cost: $9,699. Funding: BCEO FA
Photo: Old bridge - top view
Photo: Old bridge - side view
MORMAN RD - Minton Rd to Stahlheber Rd Resurfacing COMPLETE. 1.0 mile. Est cost: $105,642. Funding: BCEO
Photo: Complete
MORMAN RD - Ohio 129 to Columbus Dr West Resurfacing COMPLETE. 0.3 mile. Est cost: $31,233. Funding: BCEO
QUEEN MARY LN - Sir Martin Dr to curb section Resurfacing COMPLETE. 0.1 mile. Est cost: $7,002. Funding: Han Twp
SIR DOUGLAS DR - Sir Edward Dr to dead end Resurfacing COMPLETE. 0.3 mile. Est cost: $44,815. Funding: Han Twp
SIR EDWARD DR - Sir Martin Dr to new pavement Resurfacing COMPLETE. 0.1 mile. Est cost: $21,427. Funding: Han Twp
SIR LAWRENCE DR - Sir Martin Dr to dead end Resurfacing COMPLETE. 0.2 mile. Est cost: $28,149. Funding: Han Twp
SIR MARTIN DR - Sir Lawrence Dr to Ohio 129 Resurfacing COMPLETE. 0.3 mile. Est cost: $49,576. Funding: Han Twp
STILLWELL RD - Bunker Hill Woods Rd (Rly Twp) to Salman Rd Resurfacing (chip seal) COMPLETE. 1.4 miles. Est cost: $113,819. Funding: BCEO
VANDA AV at Boyle Rd Culvert replacement COMPLETE. Est cost: $20,000. Funding: BCEO FA
WALTHAM CT - Sir Martin Dr to dead end Resurfacing COMPLETE. 0.1 mile. Est cost: $11,484. Funding: Han Twp
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HANKINS RD - LeSourdsville West Chester Rd to Mauds Hughes Rd Resurfacing (chip seal) COMPLETE. 1.4 miles. Est cost: $68,080. Funding: Lemon Twp
Various streets and roads in the City of Monroe Resurfacing COMPLETE. Funding: City of Monroe
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BETHANY RD at LIBERTY CT & CINCINNATI DAYTON RD Intersection / roadway improvements - add turn lanes, upgrade Lib Ct COMPLETE. Cost: $604,759. Funding: Lakota Schools, Lib Twp, BCEO. Road closure on Bethany thru Aug 4. Liberty Ct closed after Bethany opened.
Photo: Construction - view west from Lib Ct
Photo: Construction - view east from Lib Ct
Photo: Construction - view north on Lib Ct toward Bethany Rd
Photo: Construction - view south of new turn lane on Cin Day Rd
Photo: Complete - view west on Bethany toward Lib Ct
Photo: Complete - view north on Lib Ct toward Bethany Rd
BETHANY RD overpass at I-75 Rehabilitation in conjunction w/ I-75 widening COMPLETE. ODOT project.
BEXHILL DR - Tree View Dr to Castle Hill Dr Resurfacing COMPLETE. 0.1 mile. Est cost: $15,129. Funding: Lib Twp
BRADY CT - Devon Dr to cul-de-sac Resurfacing COMPLETE. 0.3 mile. Est cost: $35,521. Funding: Lib Twp
CINCINNATI DAYTON at MILLIKIN RD Intersection improvement, safety upgrade - turn lanes COMPLETE. Cost: $383,919. Funding: BCEO
COX RD - extension north of Hamilton Mason Rd Extend road north from Ham Mason to golf course COMPLETE. TID project. Phase 1 of Ohio 129 / I-75 interchange expansion (Liberty Interchange) Cost: $4,402,276. Funding: Assessment.
Schematic: New ramps and roadway configurations.
DEER RUN CT - Devon Dr to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $11,709. Funding: Lib Twp
DEER RUN DR - Devon Dr to Dartford Wy Resurfacing COMPLETE. 0.2 mile. Est cost: $21,049. Funding: Lib Twp
DEVON DR - Eddington Dr to Yankee Rd Resurfacing COMPLETE. 0.6 mile. Est cost: $103,428. Funding: Lib Twp
FOXSTONE CT - Stonehenge Blvd to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $10,130. Funding: Lib Twp
HAMILTON MASON RD - N&S RR to Cin Day Rd Roadway improvement - widen to 3 & 5 lanes COMPLETE. Cost: $2,470,346. Funding: BC TIF, private
News release - May 20, 08

News release - Nov 28, 07
Photo: Original road - view west
Photo: Construction - view west from Cin Day
Photo: Construction - view east from Lib Grande Dr
Photo: Construction - view east toward Cin Day
Photo: Complete - view west from Cin Day
Photo: Complete - view west. New signals at Lib West Dr
HAMILTON MASON RD - Cox Rd to But War Rd Roadway improvement - widen to 5 lanes COMPLETE. TID project. Phase 2 of Ohio 129 / I-75 interchange expansion (Liberty Interchange). Cost: $2,620,113. Funding: BC TIF, Lib & WC Twp.
Schematic: New ramps and roadway configurations.
HAMILTON MASON RD at LIBERTY FAIRFIELD and VINNEDGE RDS Intersection improvement - Relocate Lib Ffd to align w/ Vinnedge at Ham Mason, install roundabout COMPLETE. Cost: $998,752. Funding: State OPWC, BCEO
News release.

Simplified project schematic.
Image: Aerial diagram of project
Image: Project plan overlay on aerial photo
Photo: Aerial - original view south
Photo: View west of roundabout construction
Photo: Construction - new section of Lib Ffd toward Ham Mason Rd
Photo: Construction - new roundabout in place
Photo: Construction - splitter island stamping
Photo: Construction - view north new section Lib Ffd Rd
Photo: Construction - view south from new Lib Ffd Rd
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial view south
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial close-up
Photo: Complete - view NW
Photo: Complete -old and new sections of Lib Ffd
Photo: Complete - sign approaching from north
Photo: Complete - view NW
HAMILTON MASON RD - LeSourdsville West Chester Rd to Mauds Hughes Rd Resurfacing COMPLETE. Est cost: $158,888. Funding: WC Twp
HOLLOWAY DR - Devon Dr to south 471 ft Resurfacing COMPLETE. 0.1 mile. Est cost: $12,103. Funding: Lib Twp
I-75 - Cincinnati Dayton Rd to Middletown corp Widen to 4 lanes in each direction, upgrade interchanges at Ohio 63 and Ohio 122 Under construction. Completion: 2010. ODOT project. Est cost: $98 million.
Complete project details.
I-75 at OHIO 129 (Liberty Interchange) Expanded interchange - distributor/collector road for new hwy access to Ham Mason Rd and Cox Rd TID project. Phase 3 of Ohio 129 / I-75 interchange expansion (Liberty Interchange). TID project in conjunction with ODOT, OKI, Lib Twp, WC TWP, BCEO. New ramps to Ham Mason Rd to be constructed in conjunction w/ ODOT I-75 widening project. Cost: $14,768,357. Funding: But Co, Lib Twp, WC Twp. Start: mid-08. Completion: late 2010.
Schematic: New ramps and roadway configurations.
JESSICA CT - Holloway Dr to cul-de-sac Resurfacing COMPLETE. 0.2 mile. Est cost: $26,443. Funding: Lib Tw
KYLES STATION RD overpass at I-75 Rehabilitation in conjunction w/ I-75 widening COMPLETE. ODOT project.
LIBERTY FAIRFIELD RD Bridge #03.803 (over Great Miami River) Replacement and roadway realignment Under construction eff Mar 08. Completion: 09. No closures until 09. Cost: $10,312,716. Funding: Federal, State, BCEO
News release.

Image: View project plan overlay on aerial photo
Photos: Click for Lib Ffd Rd Bridge photos page
LIBERTY FAIRFIELD RD Culvert #00.733 Rehab / maintenance COMPLETE. Funding: BCEO FA
LINDSEY CT - cul-de-sac to cul-de-sac Resurfacing COMPLETE. 0.4 mile. Est cost: $58,675. Funding: Lib Twp
LINN RD Drainage improvements - ditching & piping COMPLETE. Cost: $35,719. Funding: BCEO FA
MILLIKIN RD overpass at I-75 Rehabilitation in conjunction w/ I-75 widening COMPLETE. ODOT project.
OHIO 747 at KYLES STATION RD Intersection improvement COMPLETE. Cost: $2,692,412. Funding: Liberty Twp RID
News release.

Construction phasing.
Photo: Original intersection - aerial view south
Photo: Construction - view south. 747 section completed
Photo: Construction - view north. 747 section completed
Photo: Construction - east leg Kyles Stn
Photo: Construction - view south at intersection
Photo: Near completion - aerial view west
Photo: Near completion - aerial view north
Photo: Near completion - aerial view south
Photo: Near completion - aerial view west
PRINCETON RD at BUTLER WARREN RD Intersection improvement - widen turning radii on west side of intersection COMPLETE. Cost: $33,042. Funding: Lib Twp (materials), BCEO FA (labor)
Photo: Complete - view north
Photo: Complete - view south
PRINCETON RD overpass at I-75 Rehabilitation in conjunction w/ I-75 widening COMPLETE. ODOT project.
SHAWNA CT - cul-de-sac to cul-de-sac Resurfacing COMPLETE. 0.4 mile. Est cost: $48,677. Funding: Lib Twp
SHELBURNE CT - Bexhill Dr to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $8,420. Funding: Lib Twp
STONEBROOKE CT - Stonehenge Blvd to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $11,840. Funding: Lib Twp
STONERUN PL - cul-de-sac to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $10,788. Funding: Lib Twp
TREE VIEW DR - Bexhill Dr to Bexhill Dr Resurfacing COMPLETE. 0.2 mile. Est cost: $30,916. Funding: Lib Twp
YANKEE RD Culvert #03.718 Emergency replacement COMPLETE. Cost: $22,931. Funding: Lib Twp (materials), BCEO (labor)
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALLEY east of Ohio 122 Resurfacing COMPLETE. 0.1 mile. Est cost: $3,686. Funding: Mad Twp
ELK CREEK RD Culvert #05.652 Replacement COMPLETE. Cost: $49,182. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: Construction
Photo: Construction
Photo: Complete
EMERICK AV - Ohio 122 to dead end Resurfacing COMPLETE. 0.2 mile. Est cost: $15,698. Funding: Mad Twp
LEICHTY AV - Trenton Franklin Rd to dead end Resurfacing COMPLETE. 0.2 mile. Est cost: $11,874. Funding: Mad Twp
LIBERTY FAIRFIELD RD Bridge #03.803 (over Great Miami River) Replacement and roadway realignment Under construction eff Mar 08. Completion: 09. No closures until 09. Cost: $10,312,716. Funding: Federal, State, BCEO
News release.

Image: View project plan overlay on aerial photo
Photos: Click for Lib Ffd Rd Bridge photos page
MADISON TWP north fire house parking lot on Ohio 4 Resurfacing COMPLETE. Est cost: $2,383. Funding: Mad Twp
MYERS RD - Browns Run Rd to Midd Germantown Rd Resurfacing COMPLETE. 1.7 miles. Est cost: $110,148. Funding: Mad Twp
OHIO 122 at CSX RR Crossing replacement COMPLETE. Funding: CSX
PREBLE COUNTY LINE RD - Strebee Rd to Preblewood Resurfacing COMPLETE. 0.4 miles. Est cost: $24,085. Funding: Mad Twp
SLOEBIG RD - Browns Run Rd to Thomas Rd Resurfacing COMPLETE. 1.1 miles. Est cost: $71,764. Funding: Mad Twp
SYCAMORE AV - Vine St to Trenton Franklin Rd Resurfacing COMPLETE. 0.04 mile. Est cost: $3,374. Funding: Mad Twp
TRENTON FRANKLIN RD at CSX RR Crossing replacement COMPLETE. Funding: CSX
VINE ST - Ohio 122 to Sycamore Av Resurfacing COMPLETE. 0.01 mile. Est cost: $5,997. Funding: Mad Twp
WATER ST - Vine St to Trenton Franklin Rd Resurfacing COMPLETE. 0.1 mile. Est cost: $2,854. Funding: Mad Twp
WAYNE MADISON RD Culvert #06.298 Repairs / rehab COMPLETE. Cost: $7,788. Funding: Way Twp
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
EATON RD - Taylor School Rd to U.S. 127 Resurfacing COMPLETE. 2.3 miles. Est cost: $218,100. Funding: BCEO
HAMILTON EATON RD at N&S RR Crossing repairs COMPLETE. Funding: N&S
HUSTON RD Culvert #00.922 Replacement COMPLETE. Cost: $22,821. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
HUSTON RD Culvert #01.211 Replacement COMPLETE. Cost: $18,234. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
HUSTON RD Culvert #01.316 Replacement COMPLETE. Cost: $21,779. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - outlet side
HUSTON RD Culvert #01.642 Replacement COMPLETE. Cost: $27,177. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
HUSTON RD Culvert #01.849 Replacement COMPLETE. Cost: $8,385. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
OXFORD MILFORD RD - Somerville Rd to Earhart Rd Resurfacing COMPLETE. 1.3 miles. Est cost: $84,824. Funding: Mil Twp
SCOTT RD Culvert #00.353 Replacement COMPLETE. Cost: $8,039. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - outlet side
SOMERVILLE RD at N&S RR Crossing repairs COMPLETE. Funding: N&S
STATE RD at N&S RR Crossing repairs COMPLETE. Funding: N&S
U.S. 127 bridge south of Somerville Rd Bridge replacement COMPLETE. ODOT project.
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD - California Rd to Schradin Rd Resurfacing (chip seal) COMPLETE. 1.3 miles. Est cost: $38,683. Funding: Mor Twp
BELL RD - Ohio 748 to Jenkins Rd Resurfacing COMPLETE. 1.5 miles. Est cost: $113,748. Funding: Mor Twp
GEORGE RD Culvert #01.242 Rehab / maintenance COMPLETE. Cost: $10,668. Funding: Mor Twp (materials), BCEO FA (labor)
MORGAN ROSS RD Bridge #01.016 (over Paddy's Run) Replacement COMPLETE. Cost: $486,538. Funding: State OPWC, BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
OHIO 126 culvert west of South Weaver Rd Replacement COMPLETE. ODOT project.
RACE LANE RD Bridge #01.457 Repairs / maintenance COMPLETE. Funding: BCEO FA
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BOOTH RD Culvert #01.060 Replacement COMPLETE. Cost: $8,713. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Old culvert - top view
Photo: Old culvert - outlet side
OXFORD MILFORD RD - Somerville Rd to Earhart Rd Resurfacing COMPLETE. 1.3 miles. Est cost: $84,824. Funding: Mil Twp
STILLWELL BECKETT RD - Indian Creek Rd to Riggs Rd Resurfacing COMPLETE. 1.0 mile. Est cost: $75,101. Funding: Oxf Twp
STOUT RD at CSX Railroad Crossing replacement COMPLETE. Funding: CSX
Photo: Crossing before replacement
Photo: Crossing before replacement
Photo: Crossing before replacement
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
FYE RD - Gates Rd to dead end Resurfacing (chip seal) COMPLETE. 0.6 mile. Est cost: $11,281. Funding: Rly Twp
GARVER ELLIOT RD - Stephenson Rd to Bunker Hill Woods Rd Resurfacing COMPLETE. 1.2 mile. Est cost: $90,421. Funding: Rly Twp
HART RD Culvert #00.101 Replacement COMPLETE. Funding: BCEO FA (labor), Rly Twp (materials)
INDIAN CREEK RD Bridge #01.360 (over Indian Creek) Replacement COMPLETE. Cost: $821,712. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view north
Photo: Old bridge - side view
Photo: New bridge - top view north
Photo: New bridge - top view south
Photo: New bridge - side view
Photo: New bridge - top view south
Photo: New bridge - top view north
INDIAN CREEK RD Culvert #01.549 Replacement COMPLETE. Cost: $9,671. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - outlet side
Photo: New culvert - outlet side
INDIAN CREEK RD Culvert #01.592 Replacement COMPLETE. Cost: $1,426. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: New culvert - outlet side
INDIAN CREEK RD Culvert #02.254 Replacement COMPLETE. Cost: $6,355. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - outlet side
Photo: New culvert - outlet side
REILY MILLVILLE RD Culvert #01.511 Replacement COMPLETE. Cost: $11,520. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
STEPHENSON RD - CSX Railroad to Stillwell Beckett Rd Resurfacing COMPLETE. 0.5 mile. Est cost: $59,806. Funding: Rly Twp
STILLWELL RD - Bunker Hill Woods Rd to Salman Rd (Han Twp) Resurfacing (chip seal) COMPLETE. 1.4 miles. Est cost: $113,819. Funding: BCEO
WOODS STATION RD at CSX Railroad Crossing and rail repairs COMPLETE. Funding: CSX
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BELLA VISTA DR and OHIO 128 Sidewalk installation COMPLETE. Funding: State CDBG
BLACK RD Bridge #01.311 Rehab / maintenance COMPLETE. Cost: $5,596. Funding: BCEO FA
BLACK RD - Hamilton New London Rd to Ross Hanover Rd Resurfacing (chip seal) COMPLETE. 1.6 miles. Est cost: $82,812. Funding: Ros Twp
BOHNE DR - US 27 to dead end Resurfacing (chip seal) COMPLETE. 0.2 mile. Est cost: $6,345. Funding: Ros Twp
BOULDER DR Culvert #00.007 Replacement COMPLETE. Cost: $7,830. Funding: Ros Twp (materials), BCEO FA (labor)
BOULDER DR Culvert #00.017 Replacement COMPLETE. Cost: $14,939. Funding: Ros Twp (materials), BCEO FA (labor)
HERMAN RD Bridge #01.706 Replacement COMPLETE. Cost: $80,892. Funding: BCEO FA, Ross Twp
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
HERMAN RD - Ohio 128 to US 27 Resurfacing (chip seal) COMPLETE. 1.2 miles. Est cost: $42,259. Funding: Ros Twp
JAY PHILLIP CT - Timberman Rd to dead end Resurfacing (chip seal) COMPLETE. 0.1 mile. Est cost: $$3,459. Funding: Ros Twp
MORGAN ROSS RD Bridge #01.016 (over Paddy's Run) Replacement COMPLETE. Cost: $436,538. Funding: State OPWC, BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
ROSS MILLVILLE RD - Ohio 128 to US 27 Resurfacing (chip seal) COMPLETE. 1.2 miles. Est cost: $118,508. Funding: Ros Twp
TIMBERMAN RD - Smith Rd to Hamilton New London Rd Resurfacing (chip seal) COMPLETE. 1.7 miles. Est cost: $99,765. Funding: Ros Twp
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
AUGSPURGER AV at N&S RR (in New Miami) Crossing repairs COMPLETE. Funding: N&S
AUGSPURGER RD at CSX RR Crossing replacement COMPLETE. Funding: CSX
HAWKINS RD Culvert #00.006 Replacement COMPLETE. Cost: $3,458. Funding: St Clr Twp (materials), BCEO FA (labor)
HAWKINS RD Culvert #00.273 Replacement COMPLETE. Cost: $8,041. Funding: St Clr Twp (materials), BCEO FA (labor)
HAWKINS RD Culvert #00.497 Replacement COMPLETE. Cost: $2,739. Funding: St Clr Twp (materials), BCEO FA (labor)
LIBERTY FAIRFIELD RD Bridge #03.803 (over Great Miami River) Replacement and roadway realignment Under construction eff Mar 08. Completion: 09. No closures until 09. Cost: $10,312,716. Funding: Federal, State, BCEO
News release.

Image: View project plan overlay on aerial photo
Photos: Click for Lib Ffd Rd Bridge photos page
MORGANTHALER RD Bridge #00.587 (over Cotton Run) Replacement COMPLETE. Cost: $156,610. Funding: BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
MORGANTHALER RD at CSX RR Crossing repair COMPLETE. Funding: CSX
SOUTH ST at N&S RR Crossing repair COMPLETE. Funding: N&S
SPRING RD at N&S RR Crossing repair COMPLETE. Funding: N&S
TAYLOR SCHOOL RD at BROOKS RD Intersection improvement - widen turning radii COMPLETE. Cost: $9,410. Funding: BCEO FA
TAYLOR SCHOOL RD at N&S RR Crossing repair COMPLETE. Funding: N&S
TRENTON RD at CSX RR Crossing replacement COMPLETE. Funding: CSX
U.S. 127 bridge north of Morganthaler Rd Bridge rehabilitation COMPLETE. ODOT project.
WEHR RD at CSX RR Crossing repair COMPLETE. Funding: CSX
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
COTTON RUN RD - Withrow Rd to Tolbert Rd Resurfacing COMPLETE. 1.6 miles. Est cost: $120,000. Funding: Way Twp
EATON RD - Taylor School Rd to U.S. 127 Resurfacing COMPLETE. 2.3 miles. Est cost: $218,100. Funding: BCEO
MILL RD - Ohio 503 to Cotton Run Rd Resurfacing (chip seal) COMPLETE. 1.0 mile. Est cost: $25,942. Funding: Way Twp
TAYLOR SCHOOL RD at BROOKS RD Intersection improvement - widen turning radii COMPLETE. Funding: BCEO FA
TAYLOR SCHOOL RD at N&S RR Crossing repair COMPLETE. Cost: $9,410. Funding: N&S
U.S. 127 bridge north of Ohio 73 (east leg) Bridge rehabilitation COMPLETE. ODOT project.
VAN TRUMP RD - Roberts Rd to 670 ft east of Ohio 503 Resurfacing (chip seal) COMPLETE. 0.6 mile. Est cost: $13,859. Funding: Way Twp
WAYNE MADISON RD Culvert #06.298 Repairs / rehab COMPLETE. Cost: $7,788. Funding: Way Twp
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALLEN RD at WINDISCH RD Intersection improvement - turn lanes, install signals, extend and connect Civic Centre Blvd from current terminus to Allen at Windisch Est cost: $1,975,000. Funding: WC Twp TIF, Ohio Dept of Development, private. Civic Centre Ext in 08. Connection to Allen at Windisch in 09
Photo: Existing intersection - Allen view west
Photo: Aerial - view north
Photo: Aerial - view south
Photo: Construction - aerial view south
ASHLEY DR - Ohio 747 to Sutton Pl Resurfacing COMPLETE. Est cost: $32,219. Funding: WC Twp
CINCINNATI DAYTON at WEST CHESTER RD Intersection improvement - add right turn lanes, modify signals COMPLETE. Cost: $1,478,340. Funding: WC Twp TIF
Photo: Construction nearly complete - aerial view east
CRESCENTVILLE RD - Mosteller Rd to Cin Day Rd Resurfacing COMPLETE. Cost: $297,500. Funding: BCEO
CRESCENTVILLE RD at N&S RR Crossing replacement COMPLETE. Funding: N&S
DUES DR - Ohio 747 to cul-de-sac Resurfacing COMPLETE. Est cost: $120,802. Funding: WC Twp
GLADES DR - Muhlhauser Rd to address #9500 Resurfacing COMPLETE. Est cost: $17,027. Funding: WC Twp
HAMILTON MASON RD - N&S RR to Cin Day Rd Roadway improvement - widen to 3 & 5 lanes COMPLETE. Cost: $2,470,346. Funding: BC TIF, private
News release - May 20, 08

News release - Nov 28, 07
Photo: Original road - view west
Photo: Construction - view west from Cin Day
Photo: Construction - view east from Lib Grande Dr
Photo: Construction - view east toward Cin Day
Photo: Complete - view west from Cin Day
Photo: Complete - view west. New signals at Lib West Dr
HAMILTON MASON RD - Cox Rd to But War Rd Roadway improvement - widen to 5 lanes COMPLETE. TID project. Phase 2 of Ohio 129 / I-75 interchange expansion (Liberty Interchange). Cost: $2,620,113. Funding: BC TIF, Lib & WC Twp.
HAMILTON MASON RD at LIBERTY FAIRFIELD and VINNEDGE RDS Intersection improvement - Relocate Lib Ffd to align w/ Vinnedge at Ham Mason, install roundabout COMPLETE. Cost: $998,752. Funding: State OPWC, BCEO
News release.

Simplified project schematic.
Image: Aerial diagram of project
Image: Project plan overlay on aerial photo
Photo: Aerial - original view south
Photo: View west of roundabout construction
Photo: Construction - new section of Lib Ffd toward Ham Mason Rd
Photo: Construction - new roundabout in place
Photo: Construction - splitter island stamping
Photo: Construction - view north new section Lib Ffd Rd
Photo: Construction - view south from new Lib Ffd Rd
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial view south
Photo: Construction - aerial view west
Photo: Construction - aerial view north
Photo: Construction - aerial close-up
Photo: Complete - view NW
Photo: Complete -old and new sections of Lib Ffd
Photo: Complete - sign approaching from north
Photo: Complete - view NW
HAMILTON MASON RD - LeSourdsville West Chester Rd to Mauds Hughes Rd Resurfacing COMPLETE. Est cost: $158,888. Funding: WC Twp
HAZELTINE CT - Sawgrass Dr to cul-de-sac Resurfacing COMPLETE. Est cost: $13,383. Funding: WC Twp
I-75 - Cincinnati Dayton Rd to Middletown corp Widen to 4 lanes in each direction, upgrade interchanges at Ohio 63 and Ohio 122 Under construction. Completion: 2010. ODOT project. Est cost: $98 million.
Complete project details.
LAKOTA DR WEST at EAGLERIDGE DR Intersection improvement - install roundabout, sidewalks, bike path, culvert replacement COMPLETE. Cost: $729,381. Funding: BCEO, WC Twp
Image: View project plan overlay on aerial photo
Photo: Construction - view east
Photo: Construction - view north
Photo: Construction - view west
Photo: Construction - view south
Photo: Construction - view west
Photo: Construction - view nw
Photo: Construction - view north
Photo: Construction - view north
Photo: Construction - view se
Photo: Construction - view east
Photo: Complete - aerial view ne
Photo: Complete - aerial view north
LESAINT DR - Muhlhauser Rd to 160 ft into WC Twp limits Roadway improvement COMPLETE. City of Fairfield project. Funding: City of Ffd.
LESOURDSVILLE WEST CHESTER RD Bridge #00.168 (over Mill Creek branch) Replacement COMPLETE. Cost: $405,447. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete - upstream side
Photo: Complete - downstream side
LESOURDSVILLE WEST CHESTER RD at new elementary school Intersection improvement - add turn lanes COMPLETE. Cost: $628,261. Funding: Lakota Schools
Photo: Complete: view south
LESOURDSVILLE WEST CHESTER RD - south of Ham Mason Rd Resurfacing COMPLETE. Est cost: $32,250. Funding: WC Twp
MEDINAH CT - Hazeltine Ct to cul-de-sac Resurfacing COMPLETE. Est cost: $4,822. Funding: WC Twp
PORT UNION RD - east of Ohio 747 Resurfacing COMPLETE. Est cost: $11,173. Funding: WC Twp
RIALTO RD at N&S RR Crossing replacement COMPLETE. Funding: N&S
SUTTON PL - at Ashley Dr Resurfacing COMPLETE. Est cost: $3,782. Funding: WC Twp
TYLERSVILLE RD - Chesterwood Blvd to Butler Warren Rd Roadway improvement - add center turn lane COMPLETE. Cost: $543,917. Funding: State OPWC, BCEO
News release.

Photo: Complete: view west
TYLERSVILLE RD at N&S RR Mill pavement at crossing COMPLETE. Cost: $4,000. Funding: BCEO
UNION CENTRE BLVD - Ohio 747 to Beckett Rd Widen berms COMPLETE. Est cost: $253,800. Funding: BCEO
UNION CENTRE BLVD at I-75 Modify exit ramps, modify overpass pavement striping to create dual left turn onto NB I-75 COMPLETE. ODOT project.
Photo: Complete - aerial view north
WINGED FOOT CT - Sawgrass Dr to cul-de-sac Resurfacing COMPLETE. Est cost: $7,479. Funding: WC Twp
WOODBRIDGE LN - Rupp Farm Ln to Eagleridge Dr Resurfacing COMPLETE. Est cost: $59,852. Funding: WC Twp
Various subdivision streets Surface rehabilitation, slurry seal, black matt COMPLETE. Cost: $821,525. Funding: WC Twp
 
• Project questions? Email us.