Completed Projects - 2010
 
2010 Projects by Township

Updated: March 16, 2011

 

Select a township by clicking on the map below.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County and township roads Centerline and edgeline restriping / retracing COMPLETE. Cost: $232,140. Funding: BCEO & twps
Various County roads in western townships Replacement / upgrade of regulatory and warning signs Project under way. Completion: 2011. Est cost: $62,500. Funding: Fed
Various County roads Install guardrail COMPLETE. Cost: $260,998.
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ASHWOOD KNOLL DR - Ham Mason Rd to cul-de-sac Resurfacing COMPLETE. 0.3 mile. Est cost: $31,356. Funding: Ffd Twp
BLUE GRASS CT - Morris Rd to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $25,801. Funding: Ffd Twp
Butler County Care Facility - Princeton Rd New driveway COMPLETE. Est cost: $78,000. Funding: Fed CDBG
BYPASS 4 at HAMILTON MASON RD Intersection and roadway improvements - additional lanes, modify signals, new superstreet construction Bypass 4 upgrade phase 1. ODOT construction. Under construction eff May. Completion: Sep 2011. Cost: $5,093,049. Funding: But Co, Ffd Twp, City of Ham, Federal ARRA (stimulus), OKI grant
Video: Superstreet demo
Bypass 4 widening additional info
BYPASS 4 at SYMMES RD Intersection and roadway improvements - additional lanes, modify signals, new superstreet construction Bypass 4 upgrade phase 2. TID project. ODOT construction. Under construction eff Jun. Completion: Sep 2011. Cost: $6,838,220. Funding: But Co, Ffd Twp, City of Ham, Federal ARRA (stimulus), OKI grant
Video: Superstreet demo
Bypass 4 widening additional info
BYPASS 4 - Symmes Rd to Hamilton Mason Rd Roadway improvement - widen to 4 lanes, new superstreet construction at Tylersville intersection Bypass 4 upgrade phase 3. TID project. ODOT construction. Under construction eff May 12. Completion: Sep 2011. Cost: $11,000,812. Funding: But Co, Ffd Twp, City of Ham, Federal ARRA (stimulus), OKI grant
Video: Superstreet demo
Bypass 4 widening additional info
BYPASS 4 - Ohio 4 (Dixie Hwy) to Symmes Rd Roadway improvements - additional lanes, roadway relocation at Ohio 4 Bypass 4 upgrade phase 4. City of Fairfield project. Under construction eff Jul 19. Completion: 2012. Cost: $10,180,000. Funding: City of Ffd, State OPWC
Bypass 4 widening additional info
LOGSDON RD - Ham Mason Rd to dead end Resurfacing COMPLETE. 0.4 mile. Est cost: $52,180. Funding: Ffd Twp
OSAGE DR - Princeton Rd to cul-de-sac Resurfacing COMPLETE. 0.6 mile. Est cost: $88,496. Funding: Ffd Twp
PRINCETON RD at MORRIS RD Handicap sidewalk installations COMPLETE. Cost: $17,747. Funding: BCEO FA
RED ASH CT - cul-de-sac to cul-de-sac Resurfacing COMPLETE. 0.4 mile. Est cost: $45,323. Funding: Ffd Twp
REIGART RD - dead end stub near Bob Evans Resurfacing COMPLETE. 0.1 mile. Est cost: $16,661. Funding: Ffd Twp
RIVER RIDGE LN Bridge #00.170 Emergency repairs Under construction. Completion: 2011. Cost: $318,055. Funding: BCEO
STONYBROOK DR - Cavalcade Dr to dead end Resurfacing COMPLETE. 0.2 mile. Est cost: $19,644. Funding: Ffd Twp
TERESA ANN DR - Ashwood Knoll Dr to Red Ash Ct Resurfacing COMPLETE. 0.1 mile. Est cost: $7,317. Funding: Ffd Twp
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
COLUMBUS DR WEST - Morman Rd to 1,130 ft east Resurfacing COMPLETE. 0.2 mile. Est cost: $35,517. Funding: Han Twp
DARRTOWN RD - Ohio 130 to Stillwell Beckett Rd Resurfacing COMPLETE. 0.8 mile. Est cost: $86,976. Funding: Han Twp
DARRTOWN RD at CSX RR Crossing repair COMPLETE. Funding: CSX
DECAMP RD at CSX RR Crossing repair COMPLETE. Funding: CSX
FOUR MILE CREEK RD - St. Clair Twp line to dead end Resurfacing COMPLETE. 1.6 miles. Est cost: $30,286. Funding: Han Twp
HUSSEY RD at CSX RR Crossing repair COMPLETE. Funding: CSX
Photo: Complete
LANES MILL RD - Nichols Rd to Shollenbarger Rd (Mil Twp) Resurfacing (chip seal / fiber mat) COMPLETE. 1.4 miles. Est cost: $80,743. Funding: BCEO
MARTHA LN - Morman Rd to Columbus Dr West Resurfacing COMPLETE. 0.2 mile. Est cost: $23,278. Funding: Han Twp
MORMAN RD at CSX RR Crossing repair COMPLETE. Funding: CSX
NICHOLS RD Culverts #02.048 / #02.080 Replacement, remove adjacent hill/knob COMPLETE. Cost: $69,085. Funding: BCEO FA
Photo: Old culvert and hill/knob - top view west
Photo: Old culvert and hill/knob- top view east
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: Construction - view west
Photo: Construction - view west
Photo: Construction (paving) - view east
Photo: Construction (paving) - view west
REILY MILLVILLE RD near Woodbine Rd and west of Cochran Rd (Rly Twp) Roadside slip repairs / stream bank restoration. Two separate slips (erosion from Indian Creek) COMPLETE. Cost: $866,636. Funding: BCEO (State OPWC 0-percent loan)
Photo: Stream bank erosion near road
Photo: Stream bank erosion near road
Photo: Construction
Photo: Construction
Photo: Near completion - view upstream
Photo: Near completion - view upstream
Photo: Near completion - view across stream
Photo: Near completion - view downstream
Photo: Near completion - view downstream
SALMAN RD - Stillwell Rd to dead end Resurfacing (chip seal) COMPLETE. 0.4 mile. Est cost: $15,927. Funding: Han Twp
STAHLHEBER RD at CSX RR Crossing repair COMPLETE. Funding: CSX
STILLWELL RD Culvert #03.416 Replacement COMPLETE. Cost: $9,057. Funding: BCEO FA
TIMBER CREEK DR - Bevington Ln to Gardner Rd Resurfacing COMPLETE. 0.1 mile. Est cost: $20,806. Funding: Han Twp
WENCELLA DR - Ohio 129 to cul-de-sac Resurfacing COMPLETE. 0.4 mile. Est cost: $46,902. Funding: Han Twp
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
OXFORD STATE RD at CSX RR Crossing repair COMPLETE. Funding: CSX
OXFORD STATE RD at CSX RR Shoulder & ditching repairs COMPLETE. Cost: $6,235. Funding: BCEO FA
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BETHANY RD - I-75 overpass to But War Rd Resurfacing COMPLETE. 0.8 mile. Est cost: $105,860. Funding: Lib Twp
CABERNET CT - Chablis Dr to cul-de-sac Resurfacing COMPLETE. 0.1 mile. Est cost: $15,797. Funding: Lib Twp
CHABLIS DR - Moselle Dr to 906 ft south Resurfacing COMPLETE. 0.2 mile. Est cost: $28,261. Funding: Lib Twp
CINCINNATI DAYTON RD - Liberty One Dr to Bethany Rd Roadway improvement - northbound lane addition, sidewalk installation COMPLETE. Cost: $345,226. Funding: BCEO (roadway), Lib Twp TIF (sidewalk)
Photo: Original view north
Photo: Original view south
Photo: Complete - view north from Lib One Dr
Photo: Complete - view north
CLAWSON RIDGE DR - Cul-de-sac to cul-de-sac Resurfacing (black mat seal) COMPLETE. 0.4 mile. Funding: Lib Twp
ELVIN LN Culvert #00.049 Replace culvert with bridge COMPLETE. Cost: $84,891. Funding: BCEO, Lib Twp
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New bridge
HAMILTON MASON RD Bridge #07.491 Emergency guardrail repairs COMPLETE. Funding: BCEO FA
HIGH SADDLE CT - Cottage View Ct to Providence Ridge Dr Resurfacing (black mat seal) COMPLETE. 0.1 mile. Funding: Lib Twp
I-75 - Cincinnati Dayton Rd to Middletown corp Widen to 4 lanes in each direction, upgrade interchanges at Ohio 63 and Ohio 122 Under construction 08. Completion: 2011. ODOT project. Cost: $98,824,590.
Complete project details.
KYLES STATION RD at YANKEE RD Intersection improvement - Install 4-way stop w/ warning flashers COMPLETE. Cost: $7,037. Funding: BCEO
LESOURDSVILLE WEST CHESTER RD - Kyles Stn Rd to Hankins Rd Resurfacing COMPLETE. 1.0 mile. Est cost: $220,534. Funding: Lib Twp
MILLIKIN RD Culvert #03.229 Replacement COMPLETE. Cost: $20,337. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - outlet
MILLIKIN RD at MAUDS HUGHES RD Intersection improvement - Install 4-way stop w/ warning flashers COMPLETE. Cost: $7,774. Funding: BCEO
MOSELLE DR - 260 ft west of Chablis to 150 ft east of Sharps Ridge Resurfacing COMPLETE. 0.2 mile. Est cost: $31,396. Funding: Lib Twp
PROVIDENCE RIDGE DR - new pavement to 50 ft east of High Saddle Resurfacing COMPLETE. 0.1 mile. Est cost: $20,143. Funding: Lib Twp
VALLEY FALLS CT - cul-de-sac to cul-de-sac Resurfacing (black mat seal) COMPLETE. 0.3 mile. Funding: Lib Twp
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
KEISTER RD - Beck Rd to Franklin Madison Rd Resurfacing COMPLETE. 1.7 miles. Est cost: $126,673. Funding: Mad Twp
Madison Twp Fire Station 153 - parking lot Resurfacing COMPLETE. Est cost: $7,347. Funding: Mad Twp
OHIO 122 - Emerick Av to Midd corp Resurfacing, install raised pavement markers COMPLETE. ODOT project. Funding: Fed - American Recovery & Reinvestment Act (stimulus)
OHIO 122 at CSX RR Crossing repair COMPLETE. Funding: CSX
OHIO 744 - Preb Cnty line (Somerville) to Ohio 122 Resurfacing COMPLETE. Est cost: $1,395,303
TRENTON FRANKLIN RD Culvert #02.098 Replacement COMPLETE. Cost: $5,988. Funding: BCEO FA
TRENTON FRANKLIN RD at CSX RR Crossing repair COMPLETE. Funding: CSX
WAYNE MADISON RD at AUGSPURGER RD Install signals COMPLETE. Cost: $52,725. Funding: BCEO
Photo: Complete
Photo: Complete - view north
WAYNE MADISON RD - Thomas Rd to dead end Resurfacing (chip seal / fiber mat) COMPLETE. 0.8 mile. Est cost: $28,588. Funding: Way Twp
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
FRAZEE RD - Oren Rd to Baker Rd Resurfacing (chip seal) COMPLETE. 1.6 miles. Est cost: $33,855. Funding: Mil Twp
HAMILTON EATON RD - US 127 to Harris Rd Resurfacing COMPLETE. 1.4 miles. Est cost: $167,956. Funding: BCEO
HAMILTON EATON RD - Somerville Rd to Somerville corp Resurfacing COMPLETE. 0.5 mile. Est cost: $88,446. Funding: BCEO
HUSTON RD - Scott Rd to Ohio 73 Resurfacing (chip seal) COMPLETE. 1.2 miles. Est cost: $70,744. Funding: BCEO
LANES MILL RD - Nichols Rd (Han Twp) to Shollenbarger Rd Resurfacing (chip seal / fiber mat) COMPLETE. 1.4 miles. Est cost: $80,743. Funding: BCEO
OHIO 744 - Preb Cnty line to Ohio 122 (Mad Twp) Resurfacing COMPLETE. Est cost: $1,395,303
OXFORD MIDDLETOWN RD at N&S RR Shoulder and ditching improvements COMPLETE. Cost: $6,235. Funding: BCEO FA
Photo: Complete
OXFORD MIDDLETOWN RD at N&S RR New lights & gates COMPLETE. Funding: N&S RR
Photo: Complete
Photo: Complete - view NW
STATE RD Culvert #01.928 Replacement COMPLETE. Est cost: $5,000. Funding: BCEO FA
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD Culvert #03.054 Replacement COMPLETE. Cost: $10,943. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
JENKINS RD Culvert #00.466 Replacement COMPLETE. Cost: $17,402. Funding: BCEO FA
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - top view west
Photo: New culvert - outlet side
JENKINS RD Culvert #00.498 Replacement COMPLETE. Cost: $14,940. Funding: BCEO FA
Photo: Old culvert - side view
Photo: New culvert - top view west
Photo: New culvert - inlet side
Photo: New culvert - outlet catch basin, view west
Photo: New culvert - new frontage pipe outlet, view east
JENKINS RD Culvert #00.984 Replacement COMPLETE. Cost: $15,410. Funding: BCEO FA
Photo: Old culvert - side view
Photo: New culvert - top view
Photo: New culvert - new inlet ditch, view east
Photo: New culvert - inlet side
Photo: New culvert - outlet side
JENKINS RD - South Wynn Rd to dead end Resurfacing (chip seal / fiber mat) COMPLETE. 0.3 mile. Est cost: $18,055. Funding: Mor Twp
RACE LANE RD Bridge #02.415 (over Dry Fork Creek) Replacement COMPLETE. Cost: $700,509. Funding: State OPWC, BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction - rebar ready for new bridge
Photo: New bridge - top view SE
Photo: New bridge - approach view NW
Photo: New bridge - top view NW
Photo: New bridge - top view NW
Photo: New bridge - underside view
Photo: New bridge - side view
Photo: New bridge - top view NW
SOUTH DWYER RD - California Rd to Okeana Drewersburg Rd Resurfacing COMPLETE. 1.4 miles. Est cost: $97,375. Funding: Mor Twp
Photo: New pavement (formal striping not yet applied)
SOUTH WYNN RD Culvert #00.728 Replacement COMPLETE. Cost: $13,364. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - top view
Photo: New culvert - inlet side
Photo: New culvert - outlet side
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BOOTH RD at CSX RR Crossing repair COMPLETE. Funding: CSX
BROOKVILLE RD Culvert #00.835 Replacement COMPLETE. Cost: $19,124. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - under/inside
Photo: New culvert - inlet side
Photo: New culvert - outlet side
BROOKVILLE RD Culvert #01.187 Replacement COMPLETE. Cost: $19,928. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - inlet side
Photo: New culvert - outlet side
BROOKVILLE RD Culvert #02.175 Replacement COMPLETE. Cost: $15,281. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Old culvert - under/inside
Photo: New culvert - side view
BROOKVILLE RD Culvert #02.394 Replacement COMPLETE. Cost: $16,081. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - inlet side
Photo: New culvert - outlet side
BROWN RD Culvert #01.582 Replacement COMPLETE. Cost: $21,071. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
OHIO 73 bridge 0.7 mile east of U.S. 27 Rehabilitation COMPLETE. Est cost: $472,000
SOMERVILLE RD Bridge #01.989 (over Harkers Run branch) Replacement COMPLETE. Cost: $387,508. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: New bridge - top view east
Photo: New bridge - side view downstream
Photo: New bridge - side view upstream
TAYLOR RD - Contreras Rd to Ringwood Rd Resurfacing COMPLETE. 0.8 mile. Est cost: $87,751. Funding: Oxf Twp
TAYLOR RD at CSX RR Crossing repair COMPLETE. Funding: CSX
U.S. 27 - Oxf corp to Indiana state line Resurfacing, install raised pavement markers COMPLETE. ODOT project. Funding: Fed - American Recovery & Reinvestment Act (stimulus)
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BOOTH RD - North Law Rd to Oxf Twp maint Resurfacing COMPLETE. 0.6 mile. Est cost: $81,053. Funding: Rly Twp
BOOTH RD at CSX RR Crossing repair COMPLETE. Funding: CSX
DECAMP RD at CSX RR Crossing repair COMPLETE. Funding: CSX
INDIAN CREEK RD - Oxf Twp line to dead end Resurfacing (chip seal) COMPLETE. 0.6 mile. Est cost: $11,218. Funding: Rly Twp
KEHR RD - Stillwell Beckett Rd to Oxf Twp line Resurfacing COMPLETE. 0.2 mile. Est cost: $31,765. Funding: Rly Twp
REILY MILLVILLE RD west of Cochran Rd and near Woodbine Rd (Han Twp) Roadside slip repairs / stream bank restoration. Two separate slips (erosion from Indian Creek) COMPLETE. Cost: $866,636. Funding: BCEO (State OPWC 0-percent loan)
Photo: Stream bank erosion near road
Photo: Stream bank erosion near road
Photo: Construction
Photo: Construction
Photo: Near completion - view upstream
Photo: Near completion - view upstream
Photo: Near completion - view across stream
Photo: Near completion - view downstream
Photo: Near completion - view downstream
REILY MILLVILLE RD Bridge #00.338 (over Indian Creek) Replacement COMPLETE. Cost: $659,692. Funding: Federal, BCEO
News release (Dec 3, 10).
News release (Aug 3, 10).

News release (Nov 18, 05).
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Complete - ribbon cutting
Photo: Complete - ribbon cutting
Photo: New bridge - top view west
Photo: New bridge - top view west
Photo: New bridge - side view downstream
Photo: New bridge - side view upstream
Photo: New bridge - underside view upstream
RIGGS RD Culvert #00.285 Replacement COMPLETE. Cost: $7,329. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - outlet side
RIGGS RD - Indian Creek Rd to Oxford Twp line Resurfacing (chip seal) COMPLETE. 0.4 mile. Est cost: $23,383. Funding: BCEO
SOUTH PIERSON RD Culvert #01.013 Replacement COMPLETE. Cost: $5,810. Funding: BCEO FA
Photo: Old culverts at Stillwell Rd intersection - top view
Photo: Old culvert - side view
SOUTH PIERSON RD Culvert #01.019 Replacement COMPLETE. Cost: $6,683. Funding: BCEO FA
Photo: Old culverts at Stillwell Rd intersection - top view
Photo: Old culvert - side view
STATE LINE CENTER RD Culvert #04.458 Replacement COMPLETE. Cost: $19,496. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: New culvert - inlet side
Photo: New culvert - outlet side
STATE LINE CENTER RD Culvert #04.691 Replacement COMPLETE. Cost: $6,741. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: New culvert - side view
STATE LINE CENTER RD - I&E RR to Join Rd (Indiana side) Resurfacing (chip seal) COMPLETE. 5.8 miles. Est cost: $225,732. Funding: BCEO
STEPHENSON RD at CSX RR Crossing repair COMPLETE. Funding: CSX
STILLWELL RD Culvert #00.124 Emergency replacement COMPLETE. Cost: $10,437. Funding: BCEO
STILLWELL BECKETT RD at CSX RR Crossing repair COMPLETE. Funding: CSX
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BLACK RD Bridge #01.311 (over Indian Creek branch) Replacement COMPLETE. Cost: $872,450. Funding: State OPWC, BCEO.
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction begins
Photo: Construction - deck removed from old bridge
Photo: Construction - view north
Photo: Construction - deck pour, view north
Photo: Construction - deck pour
Photo: Construction - deck pour, side view
Photo: Construction - deck pour, side view
Photo: New bridge - top view south
Photo: New bridge - side view north
Photo: New bridge - top view north
Photo: New bridge - upstream side view
BLACK RD - Hamilton New London Rd to Ross Hanover Rd Resurfacing COMPLETE. 1.6 miles. Est cost: $116,608. Funding: Ross Twp
BOULDER DR - Rocky Hill Dr to Herman Rd Resurfacing (black mat seal) COMPLETE. Funding: Ross Twp
HAMILTON NEW LONDON RD Bridge #05.029 (over Indian Creek) Replacement COMPLETE. Cost: $1,421,922. Funding: Federal, BCEO
News release (Nov 12, 10).

News release (Jul 19, 10).
News release (Nov 18, 05).
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: 1997 photo of bridge after east abutment washed out by flood waters
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - near completion
Photo: Complete - ribbon cutting
Photo: Complete - ribbon cutting
Photo: Complete - County Eng Wilkens and Ross Twp trustees
Photo: New bridge - top view SW
Photo: New bridge - top view SW
Photo: New bridge - side view
HERMAN RD - Hamilton New London Rd to Ohio 128 Resurfacing (black mat seal) COMPLETE. Funding: Ross Twp
ROCKY HILL DR - Boulder Dr to dead end Resurfacing (black mat seal) COMPLETE. Funding: Ross Twp
SANDY HILLS DR - Boulder Dr to dead end Resurfacing (black mat seal) COMPLETE. Funding: Ross Twp
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BROOKS RD - Eaton Rd to Taylor School Rd Resurfacing (chip seal) COMPLETE. 1.7 miles. Est cost: $54,434. Funding: St Clr Twp
FEAR NOT MILLS RD - U.S. 127 to address #3145 Resurfacing COMPLETE. 0.4 mile. Est cost: $55,179. Funding: St Clr Twp
JACKSON RD at CSX RR (north end) Crossing repair COMPLETE. Funding: CSX
JACKSON RD at CSX RR (south end) Crossing repair COMPLETE. Funding: CSX
JACKSONBURG RD - US 127 to SR 73 (Way Twp) Resurfacing COMPLETE. 2.8 miles. Est cost: $345,050. Funding: BCEO
JACKSONBURG RD at MORGANTHALER RD Intersection improvement - install roundabout COMPLETE. Cost: $387,508`. Funding: State OPWC, BCEO
Photo: Original intersection
Photo: Original intersection
Photo: Construction - view north
Photo: Construction - view NW
Photo: Construction - view east
Photo: Construction - curb / gutter
Photo: Construction - view west
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - view west
Photo: Construction - full roundabout
Photo: Construction - asphalt, base course
Photo: Complete - view north
Photo: Complete - view west
MORGANTHALER RD at CSX RR Crossing repair COMPLETE. Funding: CSX
NORTH B ST Bridge #01.542 Replacement COMPLETE. Cost: $1,404,278. Funding: State OPWC, BCEO, City of Hamilton
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction - beam delivery
Photo: Construction - beam placement
Photo: Construction - beam placement
Photo: Completed - top view
Photo: Completed - side view
SPRING RD at N&S RR Crossing repair COMPLETE. Funding: N&S
TRENTON RD at CSX RR (south end) Crossing repair COMPLETE. Funding: CSX
TRENTON RD at CSX RR (north end) Crossing repair COMPLETE. Funding: CSX
Photo: Construction - New crossing, fresh blacktop
WAYNE MADISON RD at AUGSPURGER RD Install signals COMPLETE. Cost: $52,725. Funding: BCEO
Photo: Complete
Photo: Complete - view north
WEHR RD at CSX RR Crossing repair COMPLETE. Funding: CSX
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CELESTIAL AV - Hope Dr to cul-de-sac Resurfacing (chip seal / fiber mat) COMPLETE. 0.2 mile. Est cost: $8,574. Funding: Way Twp
HOPE DR - Celestial Av to Ohio 744 Resurfacing (chip seal / fiber mat) COMPLETE. 0.1 mile. Est cost: $5,364. Funding: Way Twp
JACKSONBURG RD - US 127 (St. Clair Twp) to SR 73 Resurfacing COMPLETE. 2.8 miles. Est cost: $345,050. Funding: BCEO
JACKSONBURG RD culvert just south of village Replacement COMPLETE. Funding: Way Twp
JACKSONBURG Village Drainage improvements, catch basin upgrades COMPLETE. Cost: $35,885. Funding: Fed CDBG
OHIO 744 - Preb Cnty line (Somerville) to Ohio 122 (Mad Twp) Resurfacing COMPLETE. Est cost: $1,395,303
SHURZ RD - Stubbs Rd to Preble Cnty line Resurfacing (chip seal / fiber mat) COMPLETE. 0.6 mile. Est cost: $25,881. Funding: Way Twp
TOLBERT RD Bridge #00.427 Maintenance / repairs COMPLETE. Est cost: $50,000. Funding: BCEO FA
TOLBERT RD Bridge #01.718 Rehabilitation COMPLETE. Cost: $78,962. Funding: BCEO FA
Photo: Old bridge - top view
Photo: Old bridge - side view
WAYNE MADISON RD - Thomas Rd to dead end Resurfacing (chip seal / fiber mat) COMPLETE. 0.8 mile. Est cost: $28,588. Funding: Way Twp
WAYNES TRACE RD - Tolbert Rd to Preble Cnty line Resurfacing (chip seal) COMPLETE. 3.6 miles. Est cost: $162,985. Funding: BCEO
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
FOUNTAINS BLVD - Cin Day Rd to Squirrel Hollow Ridge Sidewalk installation along south side of road COMPLETE. Cost: $133,858. Funding: Fed CDBG
HAMILTON MASON RD Bridge #07.491 Emergency guardrail repairs COMPLETE. Funding: BCEO FA
RIALTO RD Bridge #01.105 Maintenance / repairs COMPLETE. Est cost: $50,000. Funding: BCEO FA
UNION CENTRE BLVD at IMAGINATION BLVD Install new signals at new intersection COMPLETE. Cost: $271,583. Funding: WC Twp TIF
Photo: New signals
Photo: New signals - UCB view west
Photo: New signals - Imag Blvd approaching UCB
Various township/subdivision streets Resurfacing, black mat seal COMPLETE. Resurfacing - 8.0 miles. Est cost: $1,382,823. Black mat - 7.7 miles. Est cost: $290,669. Funding: WC Twp
 
 