Completed Projects - 2013
 
2013 Projects by Township

Last updated: February 4, 2015

 

Select a township by clicking on the map below.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County and township roads Centerline and edgeline restriping / retracing - paint Cost: $339,500. Funding: BCEO, townships. Completion: 2014
Various County roads Centerline and edgeline restriping / retracing - thermoplastic COMPLETE. Cost: $141,267. Funding: Fed
Various County roads Guardrail installation COMPLETE. Cost: $281,120. Funding: Fed
Various County roads Install raised pavement markers COMPLETE. Cost: $52,239. Funding: Fed
Various County roads in western townships Replacement / upgrade of regulatory and warning signs Phase 3 (separate grant from Phase 1 grant and Phase 2 grant). Cost: $62,500. Funding: Fed, BCEO. Completion: 2014
Various County intersections Traffic signal upgrades - relamping COMPLETE. Cost: $15,500. Funding: BCEO
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HAMILTON MASON RD at MORRIS RD Intersection improvement - Add turn lane on Ham Mas between north & south legs of Morris COMPLETE. Cost: $312,899. Funding: BCEO
Photo: Construction gets started
MILLIKIN RD Culvert #00.452 Replacement COMPLETE. Cost: $10,724. Funding: BCEO FA
MILLIKIN RD Culvert #00.636 Replacement COMPLETE. Cost: $9,706. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
MILLIKIN RD - Redeemer Way to Lib Ffd Rd Resurfacing (asphalt) COMPLETE. 1.3 miles. Cost: $177,746. Funding: BCEO
Photo: Complete
LIBERTY FAIRFIELD RD - Logsdon's Woods Dr to Princeton Rd, including Bridge #00.733 Roadway improvement - widen existing lanes, add shoulders, replace bridge COMPLETE. Cost: $705,299. Funding: State OPWC, BCEO
News release (Mar 18, 2013)

News release (Sep 20, 2012)
Photo: Previous condition - view south
Photo: Previous condition - view north at bridge
Photo: Old bridge - side view
Photo: Previous condition - view north
Photo: Previous condition - view south at Ohio 129 overpass
Photo: Previous condition - view north toward Ohio 129 overpass
Photo: Construction - bridge near completion
Photo: Complete - view south
Photo: Complete - view north
OHIO 4 at LIBERTY FAIRFIELD RD Intersection improvement - dual left turn lanes from NEbound 4 to NB Lib Ffd, additional thru lanes on N & Sbound Lib Ffd COMPLETE. Cost: $2,235,393. Funding: Fed LPA, State OPWC, BCEO
News release (5/17/13)
News release (8/6/10)
Photo: Original condition - view NE
Photo: Original condition - view south
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction - view south
Photo: Construction - view north
Photo: Construction - paving
Photo: Complete - Lib Ffd view north
Photo: Complete - Lib Ffd view south
Photo: Complete - Lib Ffd view north
Photo: Complete - Ohio 4 expanded turn lanes
TULEY RD Storm sewer replacement, phase 2 Cost: $132,532. Funding: Fed CDBG. Completion: 2014
TYLERSVILLE RD east of Seward Rd Roadway improvement - modify curve, remove small hill, replace 2 culverts COMPLETE. Cost: $352,640. Funding: BCEO
News release

Photo: Original condition - view east
Photo: Old culvert that was replaced
Photo: Construction
Photo: Construction - culvert installation
Photo: Construction
Various township/subdivision streets Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $156,383. Funding: Ffd Twp
Photo: Reigart Rd complete
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 3.2 miles. Cost: $72,425. Funding: Ffd Twp
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BRUNNER RD - Stahlheber Rd to dead end Resurfacing (chip seal) COMPLETE. 0.3 mile. Cost: $4,899. Funding: Han Twp
COCHRAN RD - Ohio 129 to Reily Millville Rd Resurfacing (chip seal, microfiber) COMPLETE. 1.1 miles. Cost: $65,862. Funding: Han Twp
SHANK RD - US 27 to dead end Resurfacing (chip seal) COMPLETE. 0.6 mile. Cost: $12,533. Funding: Han Twp
Photo: Complete
STAHLHEBER RD Culvert #04.541 Replacement COMPLETE. Cost: $17,301. Funding: BCEO FA
Photo: Complete
STAHLHEBER RD Culvert #04.866 Replacement COMPLETE. Cost: $19,134. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - outlet side
Photo: Complete - top
Photo: Complete - side
STAHLHEBER RD Culvert #05.031 Replacement COMPLETE. Cost: $17,880. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Complete
STAHLHEBER RD - Reily Twp line to US 27 Resurfacing (chip seal) COMPLETE. 1.5 miles. Cost: $43,674. Funding: Han Twp
Photo: Complete
STILLWELL RD Culvert #04.268 Replacement COMPLETE. Cost: $10,677. Funding: BCEO FA
VIZEDOM RD - Ohio 130 to Ohio 177 Resurfacing (base repairs only) COMPLETE. Cost: $30,712. Funding: Han Twp
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
None
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BUTLER WARREN RD - Tylersville Rd to Bethany Rd Roadway improvement - widen to 5 lanes COMPLETE. Project in conjunction w/ Warren Co & ODOT. Cost: $9,225,709. Funding: Federal, State OPWC, BCEO, War Co.
News release (Feb 2012) - Project begins
News release (Jun 2008) - Public mtg
Public meeting displays and public comment summary
Photo: Previous condition
Photo: Previous condition
Rendering: Proposed
Photo: Construction - view south
Photo: Construction - culvert installation
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - box culvert replacement
Photo: Construction - culvert replacement complete
Photo: Construction
Photo: Construction - temp striping
Photo: Construction - temp striping
Photo: Construction - box culvert installation
Photo: Construction - box culvert installation
Photo: Construction - box culvert installation
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Complete
DUTCHLAND PKWY - Yankee Rd to pavement break Resurfacing (asphalt) COMPLETE. 0.4 mile. Cost: $79,220. Funding: Lib Twp
Photo: Complete
KYLES STATION RD at LESOURDSVILLE WEST CHESTER RD Pavement and drainage repairs COMPLETE. Funding: BCEO
KYLES STATION RD at YANKEE RD Intersection improvement - install roundabout COMPLETE. Cost: $637,125. Funding: State OPWC, BCEO
News release

Photo: Original condition - view west
Photo: Original condition - view east
Photo: Original condition - view north
Photo: Original condition - view north
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view north
Photo: Construction
Photo: Complete - view north
Photo: Complete - view west
LESOURDSVILLE WEST CHESTER RD - Van Gordon School drive to Millikin Rd Resurfacing (asphalt) COMPLETE. 0.8 mile. Cost: $104,615. Funding: Lib Twp
Photo: Complete
LIBERTY FAIRFIELD RD - Logsdon's Woods Dr to Princeton Rd, including Bridge #00.733 Roadway improvement - widen existing lanes, add shoulders, replace bridge COMPLETE. Cost: $705,299. Funding: State OPWC, BCEO
News release (Mar 18, 2013)

News release (Sep 20, 2012)
Photo: Previous condition - view south
Photo: Previous condition - view north at bridge
Photo: Old bridge - side view
Photo: Previous condition - view north
Photo: Previous condition - view south at Ohio 129 overpass
Photo: Previous condition - view north toward Ohio 129 overpass
Photo: Construction - bridge near completion
Photo: Complete - view south
Photo: Complete - view north
OHIO 4 at LIBERTY FAIRFIELD RD Intersection improvement - dual left turn lanes from NEbound 4 to NB Lib Ffd, additional thru lanes on N & Sbound Lib Ffd COMPLETE. Cost: $2,235,393. Funding: Fed LPA, State OPWC, BCEO
News release (5/17/13)
News release (8/6/10)
Photo: Original condition - view NE
Photo: Original condition - view south
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction - view south
Photo: Construction - view north
Photo: Construction - paving
Photo: Complete - Lib Ffd view north
Photo: Complete - Lib Ffd view south
Photo: Complete - Lib Ffd view north
Photo: Complete - Ohio 4 expanded turn lanes
OHIO 747 north leg at Princeton Rd SB thru lane addition COMPLETE. ODOT project.
Springhill Cemetery off of Princeton Rd Resurfacing (asphalt) COMPLETE. 0.5 mile. Cost: $23,582. Funding: Lib Twp
Photo: Complete
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 3.0 miles. Cost: $77,321. Funding: Lib Twp
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HURSH RD - Ohio 122 to West Alexandria Rd Resurfacing (asphalt) COMPLETE. 1.1 miles. Cost: $78,360. Funding: Mad Twp
Photo: Complete
STREBEE RD - Preble Co Line Rd to West Alexandria Rd Resurfacing (asphalt) COMPLETE. 0.6 mile. Cost: $40,894. Funding: Mad Twp
Photo: Complete
WAYNE MADISON RD - Thomas Rd to dead end Resurfacing (black mat seal, microfiber) COMPLETE. 0.8 mile. Cost: $17,708. Funding: Way Twp
Photo: Complete
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 1.9 miles. Cost: $38,420. Funding: Mad Twp
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BAUER RD Culvert #00.760 Replacement COMPLETE. Cost: $16,621. Funding: Mil Twp (materials), BCEO FA (labor)
DARRTOWN RD - Ohio 177 to Hanover Twp line Resurfacing (asphalt) COMPLETE. 1.1 miles. Cost: $99,367. Funding: Mil Twp
Photo: Complete
DEPOT RD Bridge #00.114 Replacement COMPLETE. Cost: $98,074 Funding: BCEO FA
Photo: Old bridge - top view west
Photo: Old bridge - side view
Photo: Old bridge - top view east
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
FRAZEE RD Bridge #01.626 (over Williams Run) Replacement COMPLETE. Cost: $358,180. Funding: State OPWC, BCEO
News release

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Old bridge - underside view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Near completion - top view
Photo: Near completion - side view
OHIO 177 bridge over Four Mile Creek (just south of Darrtown) Replacement COMPLETE. ODOT project. Cost: $1,341,000
OHIO 177 culvert between Harris Rd and Oxf Midd Rd Replacement COMPLETE. ODOT project
OXFORD MIDDLETOWN RD at N&S RR Crossing repairs COMPLETE. Funding: N&S
OXFORD MIDDLETOWN RD culvert at Ohio 177 Replacement COMPLETE. ODOT project
SOMERVILLE, Village of - Main St, Walnut Alley Storm sewer replacement Cost: $102,740. Funding: Fed CDBG. Completion: 2014
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD / CHAPEL RD at I&E RR Crossing repair COMPLETE. Funding: I&E
BUELL RD - Ohio 126 to dead end Resurfacing (chip seal) COMPLETE. 0.7 mile. Cost: $16,086. Funding: Mor Twp
Photo: Complete
JENKINS RD culvert at Bell Rd Replacement COMPLETE. Morgan Twp project. Funding: Mor Twp
JENKINS RD - Chapel Rd to Bell Rd Resurfacing (asphalt) COMPLETE. 0.5 mile. Cost: $29,732. Funding: Mor Twp
OKEANA DREWERSBURG RD Culvert #01.740 Replacement COMPLETE. Cost: $15,942. Funding: BCEO FA
Photo: Old culvert - top & side view
Photo: Old culvert - inlet side
OKEANA DREWERSBURG RD Culvert #02.812 Replacement, drainage improvements COMPLETE. Cost: $20,689. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
SCHRADIN RD Culvert #00.757 Replacement COMPLETE. Cost: $9,380. Funding: Mor Twp (materials), BCEO FA (labor)
SCHRADIN RD Culvert #00.880 Replacement COMPLETE. Cost: $12,308. Funding: Mor Twp (materials), BCEO FA (labor)
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
SCHRADIN RD Culvert #01.023 Replacement COMPLETE. Cost: $15,711. Funding: Mor Twp (materials), BCEO FA (labor)
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
SCHRADIN RD Culvert #02.079 Replacement COMPLETE. Cost: $5,271. Funding: BCEO FA
SCHRADIN RD Culvert #02.123 New culvert installation COMPLETE. Cost: $4,435. Funding: BCEO FA
SCHRADIN RD - Indiana state line to California Rd Resurfacing (chip seal) COMPLETE. 1.4 miles. Cost: $43,367. Funding: Mor Twp
Photo: Complete
SOUTH DWYER RD - California Rd to dead end Resurfacing (chip seal) COMPLETE. 0.7 mile. Cost: $16,695. Funding: Mor Twp
Photo: Complete
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BONHAM RD - Oxford corp to Hillcrest Dr Resurfacing (chip seal, microfiber) COMPLETE. 0.5 mile. Cost: $21,704. Funding: Oxf Twp
Photo: Complete
BOOTH RD Culvert #00.280 Replacement COMPLETE. Cost: $9,605. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: Complete
BOOTH RD Culvert #00.660 Replacement COMPLETE. Cost: $5,129. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
CONTRERAS RD - Indiana state line to Oxford corp Resurfacing (asphalt) COMPLETE. 2.0 miles. Cost: $219,367. Funding: BCEO
DOTY RD - Todd Rd to Brown Rd Resurfacing (chip seal) COMPLETE. 0.6 mile. Cost: $31,115. Funding: Oxf Twp
Photo: Complete
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
INDIAN CREEK RD - Springfield Rd to Riggs Rd Resurfacing (chip seal) COMPLETE. 2.9 miles. Cost: $124,455. Funding: BCEO
Photo: Complete
NORTH LAW RD Culvert #01.305 Replacement COMPLETE. Cost: $14,224. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
Photo: Complete - top
Photo: Complete - side
NORTH LAW RD - Stillwell Beckett Rd to Booth Rd Resurfacing (chip seal) COMPLETE. 1.2 miles. Cost: $72,035. Funding: BCEO
Photo: Complete
NORTH WEAVER RD - Peoria Reily Rd to Springfield Rd Resurfacing (chip seal) COMPLETE. 0.8 mile. Cost: $11,312. Funding: Rly Twp
Photo: Complete
SOUTH PIERSON RD - Stillwell Rd to Woods Station Rd Resurfacing (chip seal) COMPLETE. 1.5 miles. Cost: $22,773. Funding: Rly Twp
Photo: Complete
STEPHENSON RD - North Law Rd to Hanover Twp line Resurfacing (microfiber) COMPLETE. 0.7 mile. Cost: $16,973. Funding: Rly Twp
Photo: Complete
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BLACK RD just north of Ham New London Rd Pavement repairs COMPLETE. Ross Twp project. Funding: Ross Twp
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
AUGSPURGER RD Culvert #01.834 >> #02.018 Replacement (moved to new location, new clv # assigned) COMPLETE. Cost: $6,593. Funding: BCEO FA
NORTH B ST Culvert #02.307 Replacement COMPLETE. Cost: $6,691. Funding: BCEO FA
Photo: Old culvert - inlet side
Photo: Old culvert - outlet side
NORTH B ST - Hamilton corp to New Miami corp Resurfacing (asphalt) COMPLETE. 0.6 mile. Cost: $64,013. Funding: BCEO
Photo: Complete
TRENTON RD Culvert #02.094 Replacement COMPLETE. Cost: $15,688. Funding: BCEO FA
TRENTON RD at CSX RR (west crossing) Emergency crossing repairs (Mar), full crossing repair (summer) COMPLETE. Funding: CSX
TRENTON RD at CSX RR (east crossing) Emergency crossing repairs COMPLETE. Funding: CSX
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CELESTIAL AV - Hope Av to cul-de-sac Resurfacing (black mat seal, microfiber) COMPLETE. 0.2 mile. Cost: $5,543. Funding: Way Twp
Photo: Complete
HOPE AV - Ohio 744 to Celestial Av Resurfacing (black mat seal, microfiber) COMPLETE. 0.1 mile. Cost: $2,861. Funding: Way Twp
Photo: Complete
JACKSONBURG RD Culvert #07.775 Rehab - Pour concrete floor COMPLETE. Cost: $10,167. Funding: BCEO FA
JACKSONBURG RD - Ohio 73 to Jacksonburg corp Resurfacing (asphalt) COMPLETE. 3.7 miles. Cost: $359,499. Funding: BCEO
Photo: Complete
JACKSONBURG RD - Jacksonburg corp to Preble Co line Resurfacing (chip seal) COMPLETE. 2.1 miles. Cost: $125,977. Funding: BCEO
MILL RD Bridge #00.682 (over Elk Creek branch) Deck replacement COMPLETE. Cost: $91,680. Funding: BCEO FA
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Near completion - top view
Photo: Near completion - side view
Photo: Complete
MILL RD - Ohio 503 to Cotton Run Rd Resurfacing (chip seal) COMPLETE. 1.0 mile. Cost: $26,359. Funding: Way Twp
OHIO 73 bridge over Cotton Run Creek Replacement COMPLETE. ODOT project.
OHIO 503 culvert south of Tolbert Rd Replacement COMPLETE. ODOT project.
SHURZ RD - Stubbs Rd to Preble Co line Resurfacing (black mat seal, microfiber) COMPLETE. 0.6 mile. Cost: $16,716. Funding: Way Twp
Photo: Complete
TOLBERT RD - Cotton Run Rd to Jacksonburg Rd Resurfacing (black mat seal, microfiber) COMPLETE. 1.6 miles. Cost: $38,680. Funding: Way Twp
Photo: Complete
WAYNE MADISON RD - Thomas Rd to dead end Resurfacing (black mat seal, microfiber) COMPLETE. 0.8 mile. Cost: $17,708. Funding: Way Twp
Photo: Complete
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BUTLER WARREN RD - Tylersville Rd to Bethany Rd Roadway improvement - widen to 5 lanes COMPLETE. Project in conjunction w/ Warren Co & ODOT. Cost: $9,225,709. Funding: Federal, State OPWC, BCEO, War Co.
News release (Feb 2012) - Project begins
News release (Jun 2008) - Public mtg
Public meeting displays and public comment summary
Photo: Previous condition
Photo: Previous condition
Rendering: Proposed
Photo: Construction - view south
Photo: Construction - culvert installation
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - view north
Photo: Construction - view south
Photo: Construction - view south
Photo: Construction - box culvert replacement
Photo: Construction - culvert replacement complete
Photo: Construction
Photo: Construction - temp striping
Photo: Construction - temp striping
Photo: Construction - box culvert installation
Photo: Construction - box culvert installation
Photo: Construction - box culvert installation
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Construction - intermediate (binder) course asphalt layer
Photo: Complete
BUTLER WARREN RD - White Hill Ln to Tylersville Rd Resurfacing (asphalt) COMPLETE. 0.3 mile. Cost: $51,418
DIMMICK RD - Cin Day Rd to Windwood Dr Resurfacing (asphalt) COMPLETE. 1.2 miles. Cost: $121,790
FIELDS ERTEL RD - Ind Crk Dr / Copperfield Dr to Ind Spr Dr / Reed Hartman Hwy Roadway improvement COMPLETE. City of Sharonville project.
LAKOTA DR WEST Culvert #00.168 Replacement COMPLETE. Cost: $19,879. Funding: BCEO FA
Photo: Old culvert - outlet side
LAKOTA DR WEST - UCB to Muhlhauser Rd Resurfacing (asphalt) COMPLETE. 0.6 mile. Cost: $103,677
LESOURDSVILLE WEST CHESTER RD - Beckett Ridge Blvd to Tylersville Rd Resurfacing (asphalt) COMPLETE. 0.8 mile. Cost: $85,560
Photo: Complete
OHIO 747 at N&S RR Crossing repairs COMPLETE. Funding: N&S
RED MILL DR - dead end section Storm sewer improvements COMPLETE. Cost: $29,430. Funding: WC Twp (materials), BCEO FA (labor)
SMITH RD - Ohio 747 to Beckett Rd Resurfacing (asphalt) COMPLETE. 0.5 mile. Cost: $141,403
Photo: Complete
TYLERSVILLE RD at GRACE MEADOWS WAY Intersection improvement - fill dip on Tylersville, correct sight distance, add turn lane, replace culvert COMPLETE. Cost: $466,180. Funding: BCEO
News release

Photo: Original condition - view west toward Grace Meadows
Photo: Original condition - view east from Grace Meadows
Photo: Original condition - culvert to be replaced
Photo: Construction - view east
Photo: Construction - new headwall for new culvert
Photo: Construction - new culvert
Photo: Construction - new culvert
Photo: Construction - fill work, almost complete
Photo: Construction - fill work, almost complete
Photo: Construction - new pavement and striping, almost complete
Photo: Complete
Photo: Complete
Photo: Complete
UNION CENTRE BLVD - Ohio 747 to Beckett Rd Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $354,176
Various township/subdivision streets Resurfacing (asphalt) COMPLETE. 8.7 miles. Cost: $1,300,537. Funding: WC Twp
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 7.0 miles. Cost: $185,046. Funding: WC Twp
West Chester Twp service center parking lot Resurfacing (chip seal) COMPLETE. Cost: $4,423. Funding: WC Twp
 
 
• Project questions? Email us.