Completed Projects - 2015
 
2015 Projects by Township

Updated: March 23, 2016

 

Select a township by clicking on the map below.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County roads Centerline and edgeline restriping / retracing - thermoplastic COMPLETE. Cost: $115,132. Funding: Fed HSIP
Various County and township roads Centerline and edgeline restriping / retracing - paint COMPLETE. Cost: $264,609. Funding: BCEO, townships
Various County roads Install guardrail COMPLETE. Cost: $248,175. Funding: Fed HSIP
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BELMONT AV - Tuley Rd to Pater Av Tuley/Belmont storm sewer replacement, phase 3 COMPLETE. Cost: $172,576. Funding: Fed CDBG
HEADGATES RD Culvert #00.904 Replacement COMPLETE. Cost: $15,017. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Complete
HEADGATES RD - Ohio 4 to Canal Rd Resurfacing (asphalt) COMPLETE. 1.5 miles. Cost: $163,353. Funding: BCEO
Photo: Complete
MORRIS RD - address #6504 to electrical box, Ohio 129 underpass Resurfacing (asphalt) COMPLETE. 0.2 mile. Cost: $24,738. Funding: Ffd Twp
REIGART RD - Spring Crest Dr to Rentschler Forest MetroPark Resurfacing (asphalt) COMPLETE. 0.4 mile. Cost: $45,501. Funding: Ffd Twp
Photo: Complete
Various township/subdivision streets Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $122,127. Funding: Ffd Twp
Various township/subdivision streets Curb replacement COMPLETE. 424 linear ft. Cost: $59,726. Funding: Ffd Twp
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
Alamo Heights - various streets Curb repairs COMPLETE. Cost: $198,472. Funding: Fed CDBG
BOYLE RD at bridge over CSX RR Guardrail repairs COMPLETE. Funding: CSX
DECAMP RD - Stillwell Rd to maint line Resurfacing (chip seal) COMPLETE. 0.7 mile. Cost: $39,820. Funding: Rly Twp
Photo: Complete
GARDNER RD - Beissinger Rd to Hamilton corp Resurfacing (chip seal, base repair only) COMPLETE. Cost: $3,597. Funding: Han Twp
KRUCKER RD - Ohio 130 to Stillwell Beckett Rd Resurfacing (chip seal, base repair only) COMPLETE. Cost: $23,265. Funding: Han Twp
NICHOLS RD - Rly Twp line to Lanes Mill Rd Resurfacing (chip seal) COMPLETE. 1.2 miles.ost: $47,226. Funding: Han Twp
Photo: Complete
STILLWELL RD - Salman Rd to US 27 Resurfacing (asphalt) COMPLETE. 1.1 miles. Cost: $121,435. Funding: BCEO
WOODBINE RD - U.S. 27 to Reily Millville Rd Resurfacing (chip seal) COMPLETE. 1.0 mile. Cost: $45,058. Funding: Han Twp
Photo: Complete
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 0.5 miles. Cost: $31,232. Funding: Han Twp
Various township/subdivision streets Curb replacement COMPLETE. Cost: $24,206. Funding: Han Twp
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HAMILTON MIDDLETOWN RD (South Main St - Excello) at CSX RR Crossing repairs COMPLETE. Funding: CSX
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CINCINNATI DAYTON RD north of Ham Mason Rd / Lib Way Remove island, drainage improvements COMPLETE. Cost: $68,509. Funding: BCEO FA
Photo: Construction
KYLES STATION RD - Old Kyles Stn Rd to Ohio 747 Roadway improvement - widen existing lanes, add full shoulders COMPLETE. Cost: $215,947. Funding: BCEO
News release.

Photo: Original condition - view east
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
KYLES STATION RD at Cherokee Elementary School and other nearby locations Install sidewalks COMPLETE. Cost: $128,550. Funding: Fed (Safe Routes To School program)
LIBERTY WAY - Cin Day Rd to I-75 Add turn lanes at various locations COMPLETE. Project in conjunction with Liberty Center development
LIBERTY WAY at I-75 Upgrades to exit ramps COMPLETE. Project in conjunction with Liberty Center development
MAUDS HUGHES RD Bridge #01.400 (over Gregory Creek) Replacement COMPLETE. Project begun in 2014. Completed 2015. Cost: $2,030,709. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction - overnight deck pour
Photo: Construction - overnight deck pour
Photo: Construction - overnight deck pour
Photo: Complete - top view
Photo: Complete - side view
MAUDS HUGHES RD Bridge #02.500 (over N&S Railroad) Replacement COMPLETE. Cost: $3,313,929 (includes Brg #2.653 listed below. Both bridges to be replaced as part of same contract.). Funding: Fed, BCEO
News release

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction begins
Photo: Construction begins
Photo: Construction begins
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - dismantling old bridge (in snow)
Photo: Construction - new bridge construction begins
Photo: Construction - new bridge construction begins
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction
Photo: Construction
Photo: Construction - sealing concrete
Photo: Construction - sealing concrete
Photo: Construction
Photo: Construction - paving
Photo: Near completion - under side
Photo: Near completion - under side
Photo: Near completion - striping
Photo: Near completion - striping
Photo: Complete - side view
Photo: Complete - side view
Photo: Complete - side view
Photo: Complete - under side
MAUDS HUGHES RD Bridge #02.653 Replacement COMPLETE. Cost: $3,554,959 (includes Brg #2.500 listed above. Both bridges to be replaced as part of same contract.). Funding: Fed, BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: New bridge - construction
MAUDS HUGHES RD - Princeton Rd to Brg #02.500 Roadway improvement - rehab and resurfacing COMPLETE. Lib Twp project. Cost: $180,390. Funding: Lib Twp
MAUDS HUGHES RD - Ham Mason Rd to Princeton Rd Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $143,780. Funding: Lib Twp
Photo: Complete
MILLIKIN RD between LeSvl WC Rd (south leg) and Mauds Hughes Rd Roadway improvement - install turn lanes at new Turnbridge subdivision Under construction. Completion: mid-Nov. Funding: pvt
YANKEE RD Culvert #02.078 Replacement COMPLETE. Cost: $16,608. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Complete
YANKEE RD - Cin Day Rd to Dutchland Pkwy, including Dutchland west of Yankee Rd Install sidewalks COMPLETE. Cost: $258,954. Funding: Fed, Lib Twp
Photo: Original condition - sidewalk to be installed to left (south and west side of road)
Photo: Original sidewalk to be extended
Photo: Complete
Photo: Complete
Photo: Complete
Various township/subdivision streets Resurfacing (asphalt) COMPLETE. 2.6 miles. Cost: $311,306. Funding: Lib Twp
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 1.7 miles. Cost: $41,889. Funding: Lib Twp
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
MICHAEL RD - West Alexandria Rd to Trenton Franklin Rd Resurfacing (chip seal) COMPLETE. 2.1 miles. Cost: $38,072. Funding: Mad Twp
Photo: Complete
MODER LN - Mosiman Rd to cul-de-sac Resurfacing (asphalt) COMPLETE. 0.2 mile. Cost: $13,658. Funding: Mad Twp
MOSIMAN RD - Howe Rd to Ohio 122 Resurfacing (asphalt) COMPLETE. 2.2 miles. Cost: $173,923. Funding: Mad Twp
OHIO 122 - various culverts Replacements COMPLETE. ODOT project.
RISTANEO DR - Mosiman Rd to cul-de-sac Resurfacing (asphalt) COMPLETE. 0.2 mile. Cost: $14,334. Funding: Mad Twp
SLOEBIG RD Bridge #00.019 (over Browns Run) Replacement COMPLETE. Cost: $537,490. Funding: State OPWC, BCEO
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction - demolition of old bridge
Photo: Construction - demolition of old bridge
Photo: Construction - demolition of old bridge
Photo: Construction - demolition of old bridge
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete - top view
Photo: Complete - side view
STREBEE RD Bridge #00.018 (over Elk Creek branch) Replacement COMPLETE. ODOT project. Est cost: $695,000. Funding: State (ODOT)
Photo: Existing bridge - top view
Photo: Existing bridge - side view
SYCAMORE RD - Radabaugh Rd to Trenton corp Resurfacing (chip seal) COMPLETE. 0.5 mile. Cost: $8,682. Funding: Mad Twp
Photo: Complete
TRENTON FRANKLIN RD Culvert #00.725 Replacement COMPLETE. Cost: $14,138. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Complete
TRENTON FRANKLIN RD Culvert #01.927 Replacement COMPLETE. Cost: $10,593. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Complete
TRENTON FRANKLIN RD Culvert #01.974 Replacement COMPLETE. Cost: $7,998. Funding: BCEO FA
TRENTON FRANKLIN RD Culvert #02.032 Replacement COMPLETE. Cost: $10,372. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
TRENTON FRANKLIN RD Culvert #03.426 Repair headwall COMPLETE. Cost: $3,164. Funding: BCEO FA
Photo: Complete
TRENTON FRANKLIN RD Culvert #03.636 Replacement COMPLETE. Cost: $4,363. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Old culvert - side view
TRENTON FRANKLIN RD Culvert #04.640 Replacement COMPLETE. Cost: $9,557. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Complete
TRENTON FRANKLIN RD - Howe to Warren Co line Resurfacing (asphalt) COMPLETE. 5.7 miles. Cost: $764,948. Funding: BCEO
Photo: Complete (Howe Rd to Oh 122)
Photo: Complete (Oh 122 to Oh 4)
Photo: Complete (Oh 4 to Franklin Madison Rd)
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BAKER RD Bridge #00.648 (over Williams Run) Replacement COMPLETE. Cost: $584,468. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction - setting beams
Photo: Construction - setting beams
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete - top view
Photo: Complete - side view
Photo: Complete - side view
EATON RD Bridge #06.045 Drainage improvements, piping and ditching around bridge. Replace guardrail on bridge. COMPLETE. Cost: $30,526. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
EATON RD Culvert #05.953 Replacement COMPLETE. Cost: $99,860. Funding: BCEO FA
HAMILTON EATON RD Bridge #07.449 (over Williams Run) Deck repair COMPLETE. Cost: $56,109. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
OXFORD MILFORD RD Culvert #01.957 Replacement COMPLETE. Cost: $39,811. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Complete - top view north
Photo: Complete - inlet side
Photo: Complete - inlet side
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD culvert just west of Schradin Rd Replacement COMPLETE. Morgan Twp project. Funding: Morgan Twp
OHIO 126 culvert near North Dwyer Rd Replacement COMPLETE. ODOT project.
RACE LANE RD Culvert #01.567 Replacement COMPLETE. Cost: $10,257. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
RACE LANE RD - Alert New London Rd to Ohio 126 Resurfacing (chip seal) COMPLETE. 1.4 miles. Cost: $74,713. Funding: BCEO
Photo: Complete
SOUTH DWYER RD culvert just north of Okeana Drewersburg Rd Replacement COMPLETE. Morgan Twp project. Funding: Mor Twp
SOUTH WEAVER RD - north of Layhigh Rd at slip repair Resurfacing (asphalt) COMPLETE. 0.1 mile. Cost: $7,767. Funding: Mor Twp
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
JONES RD - Todd Rd to Taylor Rd Resurfacing (chip seal) COMPLETE. 1.4 miles. Cost: $57,571. Funding: Oxf Twp
Photo: Complete
OXFORD MILFORD RD Culvert #01.957 Replacement COMPLETE. Cost: $39,811. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Complete - top view north
Photo: Complete - inlet side
Photo: Complete - inlet side
TAYLOR RD Culvert #02.565 Replacement COMPLETE. Cost: $7,516. Funding: Oxf Twp (materials), BCEO FA (labor)
Photo: Complete
U.S. 27 - Chestnut St to Southpointe Pkwy (City of Oxford) Roadway improvement - widen existing lanes, add full shoulders, construct additional turn lanes, replace bridge, upgrade signals COMPLETE. ODOT project in conjunction with City of Oxford. Cost: $7,566,360
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
DECAMP RD - Stillwell Rd to maint line Resurfacing (chip seal) COMPLETE. 0.7 mile. Cost: $39,820. Funding: Rly Twp
Photo: Complete
HART RD Bridge #00.187 Replacement COMPLETE. Cost: $335,179. Funding: State OPWC, BCEO
News release.

Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
OHIO 732 culverts at Dunwoody Rd Replacements COMPLETE. ODOT project.
OHIO 732 culvert in community of Reily Replacement COMPLETE. ODOT project.
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BROWN FARM DR culvert between Ohio 126 and Quercus Dr Replacement COMPLETE. Ross Twp project. Funding: Ross Twp
FENTON RD culvert Replacement COMPLETE. Ross Twp project. Funding: Ross Twp
KIRCHLING RD culverts between Layhigh Rd and U.S. 27 Replacement COMPLETE. Ross Twp projects. Funding: Ross Twp
LAYHIGH RD at OHIO 748 Intersection improvement - install roundabout COMPLETE. Cost: $808,268. Funding: Federal (HSIP), State (ODOT), BCEO
News release (6/16/15)
News release (12/22/14)
Photo: Aerial - original configuration
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
TIMBERMAN RD culvert just west of Smith Rd Replacement COMPLETE. Funding: Ross Twp
Various township/subdivision streets Resurfacing/patch (asphalt) COMPLETE. 0.1 mile. Cost: $11,408. Funding: Ross Twp
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
AUGSPURGER AV (in New Miami) at CSX RR Crossing repairs COMPLETE. Funding: CSX
AUGSPURGER RD at CSX RR Crossing repairs COMPLETE. Funding: CSX
EATON RD at BEISSINGER RD Intersection improvement - install roundabout COMPLETE. Cost: $766,875. Funding: State OPWC, BCEO
News release.

Photo: Original condition - view south
Photo: Original condition - view west
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction - paving
Photo: Construction - paving
Photo: Construction - paving
Photo: Construction
Photo: Near completion
JACKSON RD at CSX RR (south crossing) Crossing repair COMPLETE. Funding: CSX
MORGANTHALER RD at RIVERSIDE DR and CSX RR Modify intersection, install lights and crossing gates COMPLETE. Cost: $109,679. Funding: CSX
News release.
TRENTON RD - Jackson Rd to Riverside Dr Resurfacing (chip seal) COMPLETE. 1.8 miles. Cost: $110,803. Funding: BCEO
Photo: Complete
TRENTON RD at CSX RR (east crossing) Crossing repair COMPLETE. Funding: CSX
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
EATON RD at Bridge #06.045 Drainage improvements, piping and ditching around bridge. Replace guardrail on bridge. COMPLETE. Cost: $131,442. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
OHIO 122 culvert at Gingrich Rd Replacement COMPLETE. ODOT project
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BARRET RD culvert Repairs to culvert along side of roadway COMPLETE. Cost: $19,295. Funding: BCEO FA
Photo: Construction
Photo: Construction
BECKETT RD - West Chester Rd to UCB Roadway improvement - widen existing lanes, widen shoulders, resurface COMPLETE. Cost: $203,085. Funding: West Chester Twp TIF
News release.

Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
CAPSTONE BLVD at Highland Greens and Butler Tech Construction of new road COMPLETE. Cost: $2,071,306. Funding: WC Twp
Photo: Complete
Photo: Complete
CINCINNATI DAYTON RD at N&S RR overpass Drainage improvements COMPLETE. Cost: $21,718. Funding: BCEO FA
COX RD - Barret Rd to Tylersville Rd Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $197,380
HUNTER'S RIDGE DR culvert Repairs - slip line new culvert into existing culvert COMPLETE. Est cost: $75,000. Funding: BCEO
LESOURDSVILLE WEST CHESTER RD - Cin Day Rd to Beckett Ridge Blvd Resurfacing (asphalt) COMPLETE. 1.1 miles. Cost: $123,273
LIBERTY WAY - Cin Day Rd to I-75 Add turn lanes at various locations COMPLETE. Project in conjunction with Liberty Center development
LIBERTY WAY at I-75 Upgrades to exit ramps COMPLETE. Project in conjunction with Liberty Center development
MAUDS HUGHES RD - Cin Day Rd to Ham Mason Rd Resurfacing (asphalt) COMPLETE. 0.5 mile. Cost: $49,214
McCAULEY RD - Sharonville corp to Dimmick Rd Resurfacing (asphalt) COMPLETE. 0.7 mile. Cost: $64,992
STATION RD at N&S RR Crossing repairs COMPLETE. Funding: N&S
TYLER'S PLACE BLVD at LIBERTY WAY Add turn lanes COMPLETE. Project in conjunction with Liberty Center development
TYLERSVILLE RD - I-75 to Cox Rd Roadway improvement - widening. Construct additional EB lane, improve Kingsgate/Dudley intersection COMPLETE. Cost: $1,926,305. Funding: BCEO, WC Twp
News release

Project locator aerial map
Photo: Original condition - view east
Photo: Original condition - view west
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
TYLERSVILLE RD at Grace Meadows Drainage improvements, adjust slopes COMPLETE. Cost: $130,679. Funding: BCEO
WALNUT CREEK DR near Heritage Elementary School Install sidewalks COMPLETE. Cost: $128,550. Funding: Fed (Safe Routes To School program)
WEST CHESTER RD - Beckett Rd to Cin Day Rd Resurfacing (asphalt) COMPLETE. 1.9 miles. Cost: $444,128
Various township/subdivision streets Resurfacing (asphalt) COMPLETE. 10.1 miles. Cost: $1,262,650. Funding: WC Twp
Various township/subdivision streets Resurfacing (black mat seal) COMPLETE. 9.6 miles. Cost: $312,292. Funding: WC Twp
WC Twp service center parking lot, Keehner Park parking lot Resurfacing (chip seal) COMPLETE. Cost: $28,736. Funding: WC Twp
 
 
• Project questions? Email us.