Completed Projects - 2018
 
2018 Projects by Township

Updated: January 24, 2019

 

Select a township by clicking on the map below.

ALL TOWNSHIPS
ROAD / LOCATION PROJECT NOTES
Various County and township roads Centerline and edgeline restriping / retracing - paint COMPLETE. 118 mi centerline, 220 mi edgeline (County). 80 mi centerline, 120 mi (townships). Cost: $274,574. Funding: BCEO, townships
Various County roads Ditching / mowing / weed spraying Seasonal, ongoing maintenance. Funding: BCEO FA
 
FAIRFIELD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HEADGATES RD Culvert #00.014 Replace culvert, pipe ditch, install catch basins COMPLETE. Est cost: $25,000. Funding: BCEO FA
MORRIS RD - address #6504 to Millikin Rd Resurfacing (asphalt) COMPLETE. 0.9 mile. Cost: $123,719. Funding: Ffd Twp
PRINCETON RD - Jayfield Dr to Ohio 747 (Lib Twp) Roadway improvement - widen lanes and shoulders, adjust vertical profile Phase 1 complete except final paving. Phase 2 construction to begin spring 2019. Total project completion: mid-2019. Cost: $1,996,163. Funding: Fed, BCEO
News release
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Phase 1 near completion
Public exhibits and preliminary info
VINNEDGE RD - Ffd city corp limit to Evans Ct Resurfacing (asphalt) COMPLETE. 0.3 mile. Cost: $43,610. Funding: Ffd Twp
Various township / subdivision streets Resurfacing (asphalt) COMPLETE. 2.5 miles. Cost: $297,781. Funding: Ffd Twp
 
HANOVER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BRUNNER RD - near Stahlheber Rd Resurfacing (base repairs) COMPLETE. Cost: $731. Funding: Han Twp
COLUMBUS DR - near Ross Hanover Rd Resurfacing (base repairs) COMPLETE. Cost: $1,232. Funding: Han Twp
DARRTOWN RD - south of CSX RR Resurfacing (base repairs) COMPLETE. Cost: $3,405. Funding: Han Twp
LANES MILL RD Culvert #01.413 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
MINTON RD between Morman Rd and Charlberth Dr Emergency berm repairs COMPLETE. Funding: BCEO FA
MORMAN RD Culvert #01.890 Replacement COMPLETE. Funding: BCEO FA
MORMAN RD Culvert #02.455 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
MORMAN RD Culvert #02.465 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
Photo: Old culvert - side view
MORMAN RD - Stahlheber Rd to Ohio 130 Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $106,505. Funding: BCEO
NICHOLS RD Culvert #02.532 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
OHIO 129 culvert east of Cochran Rd Replacement COMPLETE. ODOT project
OHIO 177 - Ohio 130 to Beissinger Rd Culvert replacements, embankment repairs COMPLETE. ODOT project
OHIO 177 - Beissinger Rd to Stillwell Beckett Rd Culvert replacements, embankment repairs COMPLETE. ODOT project
OHIO 177 - Beissinger Rd to Ohio 73 (Mil Twp) Resurfacing (asphalt) COMPLETE. ODOT project
STILLWELL RD Culvert #03.168 Replacement COMPLETE. Funding: BCEO FA
STILLWELL RD - Bunker Hill Woods Rd (Rly Twp) to Salman Rd Resurfacing (asphalt) COMPLETE. 1.3 miles. Cost: $135,664. Funding: BCEO
STILLWELL BECKETT RD Culvert #06.316 Replacement COMPLETE. Funding: BCEO FA
STILLWELL BECKETT RD - Woods Station Rd (Rly Twp) to U.S. 27 Resurfacing (asphalt) COMPLETE. 1.2 miles. Cost: $135,964. Funding: BCEO
TAYLOR SCHOOL RD - Kinsinger Rd to Huston Rd (north leg) Resurfacing (chip seal) COMPLETE. 0.8 mile. Cost: $68,430. Funding: Han Twp
U.S. 27 culvert 0.2 mile osuth of Woodbine Rd Replacement COMPLETE. ODOT project
WOODBINE RD culvert at Shady Rd Emergency replacement COMPLETE. Est cost: $17,600. Funding: Han Twp (materials), BCEO FA (labor)
Various township / subdivision streets Resurfacing (black mat seal) COMPLETE. 0.6 mile. Cost: $86,845. Funding: Han Twp
 
LEMON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
FORRER AV at CSX RR Crossing repair COMPLETE. Funding: CSX
OXFORD STATE at CSX RR Crossing repair COMPLETE. Funding: CSX
 
LIBERTY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
CINCINNATI DAYTON RD -
Mauds Hughes Rd (WC Twp) to Ohio 129
Resurfacing (asphalt) COMPLETE. 1.4 miles. Cost: $277,817. Funding: BCEO
HAMILTON MASON RD between Illumination and Londondale Dr Drainage improvements COMPLETE. Est cost: $50,000. Funding: BCEO FA
HAMILTON MASON RD at LeSOURDSVILLE WEST CHESTER RD Intersection improvement - install roundabout COMPLETE. Cost: $1,022,253. Funding: State OPWC, BCEO
News release.

Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
Photo: Complete
KYLES STATION RD -
Ohio 4 to east of new Kroger
Resurfacing (asphalt) COMPLETE. 0.8 mile. Cost: $86,906. Funding: BCEO
MILLIKIN RD east of Jackie Dr, including Jackie and Becky Dr Drainage improvements COMPLETE. Cost: $881,893. Funding: But Co Storm Water District, Lib Twp
Photo: Flooding condition
Photo: Flooding condition
MILLIKIN RD - various locations Resurfacing (base repairs) COMPLETE. Cost: $32,012. Funding: BCEO
MILLIKIN RD at YANKEE RD Intersection improvement - install roundabout COMPLETE. Cost: $626,246. Funding: State OPWC, BCEO, Lib Twp
News release.

Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
OHIO 747 - Princeton Rd to Millikin Rd Roadway improvement - widen to 5 lanes, add full berms, add turn lane on Millikin at 747, add turn lane on 747 at Princeton, install sidewalks/paths along both sides of 747 COMPLETE. Cost: $6,534,440. Funding: Fed, local
News release.

Photo: Original condition - view south
Photo: Original condition - view north
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Near completion
Photo: Near completion
Photo: Near completion
Photo: Near completion
Photo: Complete (aerial)
Photo: Complete (aerial)
Photo: Complete (aerial)
Photo: Complete (aerial)
PRINCETON RD - Jayfield Dr (Ffd Twp) to Ohio 747 Roadway improvement - widen lanes and shoulders, adjust vertical profile Phase 1 complete except final paving. Phase 2 construction to begin spring 2019. Total project completion: mid-2019. Cost: $1,996,163. Funding: Fed, BCEO
News release
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Phase 1 near completion
Public exhibits and preliminary info
YANKEE RD - Dutchland Pkwy to Princeton Rd Roadway improvement - widen to 3 lanes, install roundabout at Yankee & Princeton, signals at Dutchland, 1 bridge replacement, 1 bridge rehab/widening, install sidewalk COMPLETE. Cost: $3,970,730. Funding: Fed, State OPWC, BCEO
News release.

Public exhibits and preliminary info
Photo (video capture): Original condition
Photo (video capture): Original condition
Photo: Construction - roundabout
Photo: Construction - roundabout
Photo: Construction - roundabout
Photo: Construction - new bridge
Photo: Construction - new bridge
Photo: Construction - roundabout paving
Photo: Construction - roundabout paving
Photo: Construction - new bridge
Photo: Construction - road work
Photo: Construction - road work
Photo: Construction - paving
Photo: Construction - paving
Photo: Construction - paving
Photo: Construction - paving
Photo: Complete
Photo: Complete
Various township / subdivision streets Resurfacing (asphalt) COMPLETE. 5.3 miles. Cost: $522,117. Funding: Lib Twp
Various township / subdivision streets Resurfacing (black mat seal) COMPLETE. 2.0 miles. Cost: $68,021. Funding: Lib Twp
 
MADISON TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ELK CREEK RD Culvert #04.880 Replacement COMPLETE. Funding: BCEO FA
ELK CREEK RD - Ohio 122 to West Alexandria Rd Resurfacing (asphalt) COMPLETE. 1.5 miles. Cost: $245,200. Funding: BCEO
FRANKLIN MADISON RD - Keister Rd to Montgomery Co line Resurfacing (asphalt) COMPLETE. 0.4 mile. Cost: $24,676. Funding: Mad Twp
HETZLER RD - various sections Resurfacing (base repairs) COMPLETE. Cost: $2,401. Funding: Mad Twp
HINKLE RD - Hetzler Rd to Montgomery Co line Resurfacing (chip seal) COMPLETE. 1.2 miles. Cost: $27,848. Funding: Mad Twp
KALBFLEISCH RD - various sections Resurfacing (base repairs) COMPLETE. Cost: $4,169. Funding: Mad Twp
MICHAEL RD - Ohio 122 to Hetzler Rd Resurfacing (asphalt) COMPLETE. 1.1 miles. Cost: $77,802. Funding: Mad Twp
MYERS RD - various sections Resurfacing (base repairs) COMPLETE. Cost: $2,077. Funding: Mad Twp
MYERS RD Bridge #00.019 (over Browns Run) Replacement COMPLETE. Cost: $802,356. Funding: Fed
Photo: Old bridge - top view
Photo: Old bridge - side view
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
Photo: Complete
News release.
OHIO 122 at CSX RR Crossing repair COMPLETE. Funding: CSX
PIERSON RD at CSX RR Crossing repair COMPLETE. Funding: CSX
PRICHARD RD - dead end to Montgomery Co line Resurfacing (chip seal) COMPLETE. 0.1 mile. Cost: $2,340. Funding: Mad Twp
RADABAUGH RD - Sycamore Rd to Ohio 73 Resurfacing (asphalt) COMPLETE. 0.6 mile. Cost: $43,540. Funding: Mad Twp
RENEE DR - Ohio 122 to Elk Creek Rd Resurfacing (asphalt) COMPLETE. 0.4 mile. Cost: $27,848. Funding: Mad Twp
TRENTON FRANKLIN RD (NORTH FIRST ST) - East Aberdeen Dr to dead end Resurfacing (chip seal) COMPLETE. 0.3 mile. Cost: $5,571. Funding: Mad Twp
TRENTON FRANKLIN RD at CSX RR Crossing repair COMPLETE. Funding: CSX
WAYNE MADISON RD at CSX RR Crossing repair COMPLETE. Funding: CSX
WEST ALEXANDRIA RD Culvert #01.698 Replacement COMPLETE. Est cost: $45,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
WEST ALEXANDRIA RD at DICKEY RD Drainage improvements - piping, ditching, install catch basins COMPLETE. Est cost: $30,000. Funding: BCEO FA
 
MILFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HAMILTON EATON RD just north of US 127 / SR 73 Roadway improvement - ease curve COMPLETE. Cost: $162,451. Funding: BCEO
Photo: Original condition
Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
HUSTON RD - Scott Rd to Ohio 73 Resurfacing (asphalt) COMPLETE. 0.8 mile. Cost: $154,972. Funding: BCEO
OHIO 73 - Oxf Mil Rd to Ohio 177 Resurfacing (asphalt) COMPLETE. ODOT project
OHIO 177 culvert between North St (Darrtown) and Ohio 73 Replacement COMPLETE. ODOT project
OHIO 177 - Beissinger Rd (Han Twp) to Ohio 73 Resurfacing (asphalt) COMPLETE. ODOT project
OHIO 177 culvert just north of Ohio 73 Replacement COMPLETE. ODOT project
OXFORD MILFORD RD Culvert #00.074 Replacement COMPLETE. Est cost: $50,000. Funding: Oxf city (materials), BCEO FA (labor)
OXFORD MILFORD RD - various sections Resurfacing (base repairs) COMPLETE. Cost: $14,126. Funding: Oxf Twp
SCOTT RD - Ohio 177 to Huston Rd Resurfacing (asphalt) COMPLETE. 2.8 miles. Cost: $345,214. Funding: BCEO
SOMERVILLE RD at N&S RR Crossing repair COMPLETE. Funding: N&S
STATE RD at N&S RR Crossing repair COMPLETE. Funding: N&S
TAYLOR SCHOOL RD - Kinsinger Rd to Huston Rd (north leg) Resurfacing (chip seal) COMPLETE. 0.8 mile. Cost: $68,430. Funding: Han Twp
 
MORGAN TOWNSHIP
ROAD / LOCATION PROJECT NOTES
ALERT NEW LONDON RD Culvert #01.731 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
ALERT NEW LONDON RD Culvert #01.926 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
ALERT NEW LONDON RD Culvert #03.258 Replacement COMPLETE. Est cost: $30,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
CHAPEL RD south side of Ohio 129 intersection Culvert replacement COMPLETE. ODOT project
LAYHIGH RD at MORGAN ROSS RD Resurfacing (asphalt) COMPLETE. Cost: $6,997. Funding: BCEO
MORGAN ROSS RD Bridge #00.390 Repair - pour concrete bottom COMPLETE. Est cost: $15,000. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
MORGAN ROSS RD Culvert #02.630 Replacement COMPLETE. Ross Twp project. Funding: Ross Twp
NEW HAVEN RD Culvert #00.056 Replacement COMPLETE. Funding: BCEO FA
NEW HAVEN RD Culvert #00.346 Replacement COMPLETE. Funding: BCEO FA
NEW HAVEN RD Culvert #00.705 Replacement COMPLETE. Funding: BCEO FA
NEW HAVEN RD Culvert #00.748 Replacement COMPLETE. Funding: BCEO FA
NEW HAVEN RD Culvert #01.586 Replacement COMPLETE. Funding: BCEO FA
NEW HAVEN RD - Hamilton Co line to Ohio 126 Resurfacing (asphalt) COMPLETE. 2.0 miles. Cost: $219,953. Funding: BCEO
OHIO 129 culvert east of Ohio 126 Replacement COMPLETE. ODOT project
OHIO 129 culvert east of California Rd Replacement COMPLETE. ODOT project
OHIO 129 culvert west of South Weaver Rd Replacement COMPLETE. ODOT project
OHIO 129 culvert east of South Weaver Rd Replacement COMPLETE. ODOT project
OHIO 748 near Bell Rd Erosion control COMPLETE. ODOT project. Cost: $566,538
ROBINSON RD Culvert #00.877 Replacement COMPLETE. Est cost: $20,000. Funding: BCEO FA
ROBINSON RD - Layhigh Rd to Ohio 129 Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $96,423. Funding: BCEO
SCHRADIN RD Culvert #01.734 Replacement COMPLETE. Est cost: $10,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
 
OXFORD TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BOOTH RD - North Law Rd to U.S. 27 Resurfacing (asphalt) COMPLETE. 0.2 mile. Cost: $31,099. Funding: BCEO
BROWN RD Culvert #01.383 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
BROWN RD Culvert #01.445 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
COLLEGE CORNER, Village of Sidewalk replacement, resurfacing - various streets COMPLETE. Cost: $142,132. Funding: Fed CDBG
OXFORD MILFORD RD Culvert #00.074 Replacement COMPLETE. Est cost: $50,000. Funding: Oxf city (materials), BCEO FA (labor)
OXFORD MILFORD RD - various sections Resurfacing (base repairs) COMPLETE. Cost: $14,126. Funding: Oxf Twp
RIGGS RD Culvert #00.578 Replacement COMPLETE. Funding: BCEO FA
RIGGS RD Culvert #00.677 Replacement COMPLETE. Funding: BCEO FA
RIGGS RD Culvert #01.625 Replacement COMPLETE. Funding: BCEO FA
RIGGS RD - Oxf/Rly Twp line to Brookville Rd Resurfacing (asphalt) COMPLETE. 2.0 miles. Cost: $141,674. Funding: BCEO
RINGWOOD RD - Taylor Rd to Oxford corp Resurfacing (base repairs) COMPLETE. Cost: $23,907. Funding: BCEO
SHERA RD - Stout Rd to Taylor Rd Resurfacing (chip seal) COMPLETE. 0.5 mile. Cost: $14,338. Funding: Oxf Twp
STILLWELL BECKETT RD Culvert #00.099 Replacement COMPLETE. Est cost: $20,000. Funding: Oxf Twp (materials), BCEO FA (labor)
STILLWELL BECKETT RD Culvert #00.763 Replacement COMPLETE. Est cost: $20,000. Funding: Oxf Twp (materials), BCEO FA (labor)
STOUT RD - Shera Rd to Hayworth Rd Resurfacing (chip seal) COMPLETE. 0.4 mile. Cost: $12,745. Funding: Oxf Twp
TAYLOR RD - Contreras Rd to U.S. 27 Resurfacing (base repairs) COMPLETE. Cost: $3,657. Funding: Oxf Twp
 
REILY TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BOOTH RD - North Law Rd to U.S. 27 Resurfacing (asphalt) COMPLETE. 0.2 mile. Cost: $31,099. Funding: BCEO
BUNKER HILL WOODS RD Culvert #00.050 Replacement COMPLETE. Est cost: $20,000. Funding: BCEO FA
BUNKER HILL WOODS RD Culvert #00.386 Replacement COMPLETE. Est cost: $30,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
BUNKER HILL WOODS RD Culvert #02.484 Replacement COMPLETE. Est cost: $12,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
BUNKER HILL WOODS RD Culvert #02.590 Replacement COMPLETE. Est cost: $15,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: Old culvert - side view
DUNWOODY RD Culvert #03.138 Replacement COMPLETE. Funding: Reily Twp
McCOY RD Bridge #01.197 Repair - pour concrete bottom COMPLETE. Est cost: $10,000. Funding: BCEO FA
NICHOLS RD culvert between North Law Rd and U.S. 27 Replacement COMPLETE. Funding: Reily Twp (materials), BCEO FA (labor)
NORTH WEAVER RD culvert btwn 129 and Dunwoody Replacement COMPLETE. Funding: Rly Twp
NORTH WEAVER RD culverts btwn Peoria Rly & Springfield Rd Replacement COMPLETE. Funding: Rly Twp
OHIO 129 culvert east of Ohio 126 Replacement COMPLETE. ODOT project
OHIO 129 culvert east of California Rd Replacement COMPLETE. ODOT project
OHIO 129 culvert west of South Weaver Rd Replacement COMPLETE. ODOT project
OHIO 129 culvert east of South Weaver Rd Replacement COMPLETE. ODOT project
STATE LINE CENTER RD Culvert #02.802 Replacement COMPLETE. Est cost: $10,000. Funding: BCEO FA
STILLWELL RD - Bunker Hill Woods Rd to Salman Rd (Han Twp) Resurfacing (asphalt) COMPLETE. 1.3 miles. Cost: $135,664. Funding: BCEO
STILLWELL BECKETT RD - Woods Station Rd to U.S. 27 (Han Twp) Resurfacing (asphalt) COMPLETE. 1.2 miles. Cost: $135,964. Funding: BCEO
 
ROSS TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BROWN FARM DR culvert Replacement COMPLETE. Ross Twp project
FENTON RD culvert Replacement COMPLETE. Funding: Ross Twp
HAMILTON NEW LONDON RD Culvert #00.527 Replacement COMPLETE. Est cost: $25,000. Funding: BCEO FA
HERMAN RD - U.S. 27 to Ham NL Rd Resurfacing (asphalt) COMPLETE. 1.2 miles. Cost: $121,140. Funding: Ros Twp
HINE RD - Smith Rd to Ohio 128 Resurfacing (black mat seal) COMPLETE. 1.2 miles. Cost: $46,478. Funding: Ros Twp
LAYHIGH RD Culvert #08.382 Replacement COMPLETE. Funding: BCEO FA
LAYHIGH RD Culvert #08.626 Replacement COMPLETE. Funding: BCEO FA
LAYHIGH RD - Ohio 126 to Ham NL Rd Resurfacing (asphalt) COMPLETE. 2.2 miles. Cost: $303,859. Funding: BCEO
LAYHIGH RD at MORGAN ROSS RD Resurfacing (asphalt) COMPLETE. Cost: $6,997. Funding: BCEO
MORGAN ROSS RD Bridge #00.390 Repair - pour concrete bottom COMPLETE. Est cost: $15,000. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
MORGAN ROSS RD Culvert #02.630 Replacement COMPLETE. Ross Twp project. Funding: Ross Twp
OHIO 129 culvert east of Cochran Rd Replacement COMPLETE. ODOT project
OHIO 129 culvert east of Ohio 748 Replacement COMPLETE. ODOT project
OHIO 129 culvert west of U.S. 27 Replacement COMPLETE. ODOT project
Various township / subdivision streets Resurfacing (black mat seal) COMPLETE. 1.4 miles. Cost: $45,414. Funding: Ros Twp
 
ST. CLAIR TOWNSHIP
ROAD / LOCATION PROJECT NOTES
AUGSPURGER AV at CSX RR (New Miami) Crossing repair COMPLETE. Funding: CSX
AUGSPURGER AV at N&S RR (New Miami) Crossing repair COMPLETE. Funding: N&S
AUGSPURGER RD at N&S RR Crossing repair COMPLETE. Funding: CSX
JACKSON RD at CSX RR (north crossing) Crossing repair COMPLETE. Funding: CSX
JACKSON RD at CSX RR (south crossing) Crossing repair COMPLETE. Funding: CSX
MORGANTHALER RD at CSX RR Crossing repair COMPLETE. Funding: CSX
NORTH B ST Culvert #02.445 Replacement COMPLETE. Funding: BCEO FA
South Hamilton Crossing (in City of Hamilton) New RR overpass at Grand Blvd/Dixie Hwy/US 127 COMPLETE. BC TID project. Cost: $17,957,405. Funding: Fed, State, City of Hamilton, BCTID, CSX RR
TAYLOR SCHOOL RD (RITTER ST) at N&S RR Crossing repairs COMPLETE. Funding: N&S
TRENTON RD at CSX RR (north crossing) Crossing repair COMPLETE. Funding: CSX
TRENTON RD at CSX RR (south crossing) Crossing repair COMPLETE. Funding: CSX
U.S. 127 at N&S RR Crossing repair COMPLETE. Funding: N&S
WAYNE MADISON RD at CSX RR Crossing repair COMPLETE. Funding: CSX
WEHR RD at CSX RR Crossing repair COMPLETE. Funding: CSX
 
WAYNE TOWNSHIP
ROAD / LOCATION PROJECT NOTES
HOWE RD Culvert #00.645 Replacement COMPLETE. Est cost: $20,000. Funding: Way Twp (materials), BCEO FA (labor)
OHIO 503 - Ohio 73 to Preble Co line Pavement repairs COMPLETE. ODOT project
OHIO 744 0.5 mi. east of Ohio 503 Culvert replacement COMPLETE. ODOT project
OHIO 744 1.0 mi. east of Ohio 503 Culvert replacement COMPLETE. ODOT project
OHIO 744 east of Waynes Trace Rd Culvert replacement COMPLETE. ODOT project
TAYLOR SCHOOL RD (RITTER ST) at N&S RR Crossing repairs COMPLETE. Funding: N&S
WAYNES TRACE RD - Ohio 744 to Preble Co line Resurfacing (asphalt) COMPLETE. 0.7 mile. Cost: $92,035. Funding: BCEO
 
WEST CHESTER TOWNSHIP
ROAD / LOCATION PROJECT NOTES
BARRET RD Bridge #00.702 Repair - pour concrete bottom COMPLETE. Est cost: $20,600. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
BARRET RD - Cox Rd to Paul Dr Resurfacing (asphalt) COMPLETE. 0.8 mile. Cost: $89,548
BECKETT RD at SMITH RD Intersection improvement - install roundabout COMPLETE. Cost: $996,084. Funding: Fed, WC Twp TIF
News release.

Public exhibits and preliminary info
Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete (aerial)
Photo: Complete (aerial)
BUTLER WARREN RD - Taffy Dr to U.S. 42 Resurfacing (asphalt) COMPLETE. 0.7 mile. Cost: $93,732
CINCINNATI DAYTON RD - West Chester Rd to Station Rd / LeSourdsville WC Rd to I-75 Roadway improvement - widen to 4 lanes, add sidewalks, replace bridge on Station, realign Station at intersection Under construction eff Jun 14, 2018. Completion: fall 2019. Cost: $7,793,109. Funding: Fed, local
News release (6/5/18)
Photo: Cin Day Rd original bridge - top view
Photo: Cin Day Rd original bridge - side view
Photo: Station Rd original bridge - side view
Photo: Station Rd original bridge - side view
Photo: Cin Day - original condition
Photo: Cin Day - original condition
Photo: Cin Day - original condition
Photo: Cin Day - original condition
Photo: Cin Day - original condition
Photo: Cin Day - original condition
Photo: Cin Day - construction
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Cin Day - construction - setting arches for new Station Rd bridge
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Construction
Public meeting materials (10/21/15)
Project overview (PowerPoint 7/20/17)
CINCINNATI DAYTON RD -
Mauds Hughes Rd to Ohio 129 (Lib Twp)
Resurfacing (asphalt) COMPLETE. 1.4 miles. Cost: $277,817. Funding: BCEO
CRESCENTVILLE RD Various catch basin repairs COMPLETE. Est cost: $50,000. Funding: BCEO
FIELDS ERTEL RD - U.S. 42 to east of Bennington Dr Roadway improvement - widen lanes, rehab pavement, install curb and gutter, bridge replacement, sidewalk along north side Under construction eff Jul 16, 2018. Completion: 2019. Est cost: $2,097,000. Funding: State OPWC, City of Sharonville, WC Twp, BCEO
HAMILTON MASON RD between Illumination and Londondale Dr Drainage improvements COMPLETE. Est cost: $50,000. Funding: BCEO FA
HAMILTON MASON RD at LeSOURDSVILLE WEST CHESTER RD Intersection improvement - install roundabout COMPLETE. Cost: $1,022,253. Funding: State OPWC, BCEO
News release.

Photo: Original condition
Photo: Original condition
Photo: Construction
Photo: Construction
Photo: Construction
Photo: Complete
Photo: Complete
Photo: Complete
I-75 / TYLERSVILLE RD INTERCHANGE Interchange improvement - Add turn lanes to exit ramps, add turn lane EB Tylersville to SB I-75, upgrade signals and signage Under construction in 2018. Completion: spring 2019. Cost: $1,362,096. Funding: Fed, BCEO
INDIAN SPRINGS DR Bridge #00.432 Repair - pour concrete bottom COMPLETE. Est cost: $35,900. Funding: BCEO FA
Photo: Bridge - top view
Photo: Bridge - side view
McCAULY RD - Dimmick Rd to West Chester Rd Resurfacing (asphalt) COMPLETE. 0.7 mile. Cost: $65,642
TYLERSVILLE RD Culvert #06.044 Replacement COMPLETE. Est cost: $60,000. Funding: BCEO FA
Photo: Old culvert - top view
Photo: old culvert - side view
UNION CENTRE BLVD - Fairfield corp to Ohio 747 Resurfacing (asphalt) COMPLETE. 1.4 miles. Cost: $277,793
WEST CHESTER RD - Barret Rd to Revere Run Resurfacing (asphalt) COMPLETE. 0.5 mile. Cost: $60,587
WINDISCH RD - Crescentville Rd to Allen Rd Resurfacing (asphalt) COMPLETE. 1.0 mile. Cost: $127,629
Various township / subdivision streets Resurfacing (asphalt) COMPLETE. 7.1 miles. Cost: $870,236. Funding: WC Twp
Various township / subdivision streets Resurfacing (black mat seal) COMPLETE. 2.6 miles. Cost: $93,951. Funding: WC Twp
 
 